Data centers and new power in Blair County, PA

20 MW of new power is waiting to connect to the grid in Blair County, PA — 1 active requests. Typical wait: 6.0 years. 1 projects are built, 12 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Blair County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Blair County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Blair County right now.

20 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 16,000 homes use.
38 MW
has actually been built
1 projects switched on so far.
6.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 7%
  • Still waiting 7%
  • Withdrawn 86%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Blair County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

14 requests ever filed
Pending applications
1
of 14 ever filed
Capacity queued
20 MW
requested, not committed
Already built
38 MW
1 projects connected
Built vs decided
7.7%
12 withdrawn
Median wait
6.0 yr
for applications still pending
Connected capacity
252 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built138 MW7.1%
Still waiting120 MW7.1%
Withdrawn12518 MW85.7%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar120 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 14 by size
ProjectTypeCapacityStatusFiledQueue
Claysburg 115kVWind180 MWwithdrawn2006-07PJM
Altoona-Raystown 230 kVSolar80 MWwithdrawn2019-03PJM
Altoona-Raystown 230 kV IIBatteries80 MWwithdrawn2021-01PJM
Altoona-Raystown 230 kV IIISolar80 MWwithdrawn2023-03PJM
Summit-West Fall 115kVWind38 MWcompleted2006-06PJM
Summit-West Fall 115kV IIWind38 MWwithdrawn2023-02PJM
Thirty First Street 115kVBatteries20 MWwithdrawn2014-10PJM
Claysburg-Puzzletown 46 kVSolar20 MWwithdrawn2020-09PJM
Claysburg-HCR Tap 46 kVSolar20 MWactive2020-09PJM
East Altoona-Pinecroft 12.47 kVSolar7 MWwithdrawn2020-02PJM
MartinsburgNatural gas4 MWwithdrawn2010-08PJM
Pemberton-Sinking Valley 12.47 kVSolar3 MWwithdrawn2020-03PJM
Bernville 13.2 kVSolar3 MWwithdrawn2020-03PJM
MartinsburgNatural gas3 MWwithdrawn2009-05PJM

How Blair County compares

#1215 in the US · #33 in PA

Blair County ranks #1215 of 1,607 US counties by power waiting to connect, and #33 of 62 in Pennsylvania.

CountyWaitingCapacity queued
York County62.9 GW
Clearfield County111.5 GW
Indiana County31.2 GW
Tioga County2974 MW
Dauphin County3896 MW
McKean County4870 MW
Centre County5591 MW
Fayette County4310 MW

Common questions about power in Blair County

How long does it take to get power for a data center in Blair County, PA?

The median wait for a project still in the interconnection queue in Blair County is 6.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Blair County have reached energization and 12 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Blair County, PA?

20 MW is currently requested across 1 active interconnection requests, and 38 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Blair County, PA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Pennsylvania policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Blair County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Blair County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Blair County on the map County reports All of Pennsylvania