Data centers and new power in Seneca County, NY

170 MW of new power is waiting to connect to the grid in Seneca County, NY — 2 active requests. Typical wait: 6.9 years. 1 projects are built, 9 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Seneca County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Seneca County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Seneca County right now.

170 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 136,000 homes use.
18 MW
has actually been built
1 projects switched on so far.
6.9 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 8%
  • Still waiting 17%
  • Withdrawn 75%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Seneca County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

12 requests ever filed
Pending applications
2
of 12 ever filed
Capacity queued
170 MW
requested, not committed
Already built
18 MW
1 projects connected
Built vs decided
10.0%
9 withdrawn
Median wait
6.9 yr
for applications still pending
Connected capacity
40 MW
indicator, see note

Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built118 MW8.3%
Still waiting2170 MW16.7%
Withdrawn9831 MW75.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2170 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
NYISONYISO cluster request window
Class Year deliverability construct plus the new cluster process.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 12 by size
ProjectTypeCapacityStatusFiledQueue
Declaration Energy CenterSolar300 MWwithdrawn2020-07NYISO
Crystal Storage ProjectBatteries175 MWwithdrawn2021-11NYISO
Gravel Road SolarSolar128 MWwithdrawn2021-08NYISO
Gravel Road SolarSolar126 MWwithdrawn2021-04NYISO
North Seneca Solar Project, LLCSolar90 MWactive2021-05NYISO
Trelina Solar Energy CenterSolar80 MWactive2018-06NYISO
Suffragette Solar Energy CenterSolar50 MWwithdrawn2021-06NYISO
Route 318Solar20 MWwithdrawn2020-08NYISO
North Seneca StorageBatteries20 MWwithdrawn2022-07NYISO
Seneca Energy ExpansionOther18 MWcompleted2005-09NYISO
SenecaOther6 MWwithdrawn2006-11NYISO
Seneca II ExpansionOther6 MWwithdrawn2012-04NYISO

How Seneca County compares

#981 in the US · #39 in NY

Seneca County ranks #981 of 1,607 US counties by power waiting to connect, and #39 of 57 in New York.

CountyWaitingCapacity queued
Suffolk County273.7 GW
Kings County83.1 GW
Orange County101.6 GW
Ulster County111.3 GW
Steuben County81.3 GW
Dutchess County71.1 GW
Nassau County21.1 GW
Genesee County4926 MW

Common questions about power in Seneca County

How long does it take to get power for a data center in Seneca County, NY?

The median wait for a project still in the interconnection queue in Seneca County is 6.9 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Seneca County have reached energization and 9 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Seneca County, NY?

170 MW is currently requested across 2 active interconnection requests, and 18 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Seneca County, NY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New York policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Seneca County — NYISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Seneca County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Seneca County on the map County reports All of New York