Data centers and new power in Steuben County, NY
1.3 GW of new power is waiting to connect to the grid in Steuben County, NY — 8 active requests. Typical wait: 2.1 years. 8 projects are built, 19 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Steuben County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Steuben County
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Steuben County right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Steuben County.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
35 requests ever filed
Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 8 | 614 MW | 22.9% |
| Still waiting | 8 | 1.3 GW | 22.9% |
| Withdrawn | 19 | 1.6 GW | 54.3% |
| Paused | 0 | — | 0.0% |
Waiting to connect, by type of power
| Type | Projects | Capacity requested |
|---|---|---|
| Batteries | 4 | 705 MW |
| Wind | 2 | 438 MW |
| Solar | 2 | 116 MW |
Key dates for projects here
no dated windows published
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
| NYISO | NYISO cluster request window Class Year deliverability construct plus the new cluster process. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 15 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Canisteo Wind | Wind | 291 MW | active | 2015-11 | NYISO |
| Fairview Summit Energy Storage | Batteries | 245 MW | active | 2026-08 | NYISO |
| Baron Winds | Wind | 239 MW | completed | 2012-11 | NYISO |
| Gemma Energy Storage | Batteries | 200 MW | active | 2024-08 | NYISO |
| Rosalen Solar Energy Center | Solar | 200 MW | withdrawn | 2019-05 | NYISO |
| Wishbone Solar | Solar | 200 MW | withdrawn | 2022-12 | NYISO |
| Celestine Storage | Batteries | 191 MW | withdrawn | 2022-03 | NYISO |
| Gemma Storage | Batteries | 190 MW | withdrawn | 2022-03 | NYISO |
| Morris Ridge Solar Energy Center | Solar | 177 MW | completed | 2018-06 | NYISO |
| Paragon II Wind Generation | Wind | 150 MW | withdrawn | 2005-10 | NYISO |
| Canisteo Hills Windfarm | Wind | 148 MW | withdrawn | 2004-09 | NYISO |
| Prattsburgh Wind Farm | Wind | 147 MW | active | 2019-02 | NYISO |
| Cohocton | Batteries | 130 MW | active | 2024-09 | NYISO |
| Cohocton | Batteries | 130 MW | active | 2026-08 | NYISO |
| Addison Solar | Solar | 120 MW | withdrawn | 2020-07 | NYISO |
How Steuben County compares
#304 in the US · #5 in NY
Steuben County ranks #304 of 1,607 US counties by power waiting to connect, and #5 of 57 in New York.
| County | Waiting | Capacity queued |
|---|---|---|
| Suffolk County | 27 | 3.7 GW |
| Kings County | 8 | 3.1 GW |
| Orange County | 10 | 1.6 GW |
| Ulster County | 11 | 1.3 GW |
| Dutchess County | 7 | 1.1 GW |
| Nassau County | 2 | 1.1 GW |
| Genesee County | 4 | 926 MW |
| Montgomery County | 7 | 890 MW |
Common questions about power in Steuben County
How long does it take to get power for a data center in Steuben County, NY?
The median wait for a project still in the interconnection queue in Steuben County is 2.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 8 projects in Steuben County have reached energization and 19 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Steuben County, NY?
1.3 GW is currently requested across 8 active interconnection requests, and 614 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Steuben County, NY a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New York policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Steuben County — NYISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.
Go deeper on Steuben County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Steuben County on the map County reports All of New York