Genesee County, NY interconnection queue
5 interconnection applications are pending in Genesee County, NY, requesting 1.2 GW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 16 have been withdrawn since 2005.
Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Genesee County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 3 | 910 MW |
| Battery | 1 | 170 MW |
| Wind | 1 | 126 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 5 | 1.2 GW | 23.8% |
| Withdrawn | 16 | 1.9 GW | 76.2% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Cider Solar | Solar | 500 MW | active | 2019-04 | NYISO |
| Genesee Wind Farm | Wind | 500 MW | withdrawn | 2005-01 | NYISO |
| GenWy Wind Farm | Wind | 478 MW | withdrawn | 2005-10 | NYISO |
| Excelsior Energy Center | Solar | 280 MW | active | 2018-06 | NYISO |
| Sweet Valley Solar | Solar | 200 MW | withdrawn | 2022-12 | NYISO |
| Sweet Valley Storage | Battery | 200 MW | withdrawn | 2022-12 | NYISO |
| Emerald Solar and Storage | Solar | 174 MW | withdrawn | 2021-09 | NYISO |
| Brusselville Solar Energy Center | Battery | 170 MW | active | 2024-09 | NYISO |
| Alabama Solar Park LLC | Solar | 130 MW | active | 2020-02 | NYISO |
| Heritage Wind | Wind | 126 MW | active | 2016-09 | NYISO |
| Alabama Ledge Wind Farm | Wind | 80 MW | withdrawn | 2005-02 | NYISO |
| Alabama Ledge Wind | Wind | 80 MW | withdrawn | 2015-03 | NYISO |
| Tonawanda Creek Wind | Wind | 75 MW | withdrawn | 2007-01 | NYISO |
| LeRoy Solar | Solar | 20 MW | withdrawn | 2017-01 | NYISO |
| Taku Wind | Wind | 20 MW | withdrawn | 2017-08 | NYISO |
Large-load connection requests in this county
Requests to connect large new demand — data centres, industry, electrification — as distinct from generation. 2 recorded here.
| Request | Capacity | Status | Queue | Stated end use |
|---|---|---|---|---|
| WNY STAMP | 300 MW | active | NYISO | DAT |
| 580 STAMP load increase | 300 MW | active | NYISO | DAT |
494 of the 545 large-load requests we hold state no end use at all, so most cannot be attributed to any industry. Where this table says “not stated”, that is the filing’s own silence, not our omission.
How this county ranks
Genesee County ranks #320 of 1,607 US counties by capacity currently queued, and #3 of 57 in New York.
Other New York counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Kings County | 7 | 2.7 GW |
| Suffolk County | 21 | 2.5 GW |
| Franklin County | 6 | 950 MW |
| Chautauqua County | 6 | 881 MW |
| Dutchess County | 5 | 854 MW |
| Montgomery County | 6 | 790 MW |
| Steuben County | 5 | 788 MW |
| Bronx County | 5 | 760 MW |