Schenectady County, NY interconnection queue
0 interconnection applications are pending in Schenectady County, NY, requesting 0 MW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 9 have been withdrawn since 1999.
Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Schenectady County, by fuel
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 0 | 0 MW | 0.0% |
| Withdrawn | 9 | 801 MW | 100.0% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Glenville Energy Park | Gas | 540 MW | withdrawn | 1999-11 | NYISO |
| Zenobe Rotterdam LLC (NYISO-C24-191) | Battery | 100 MW | withdrawn | 2024-12 | ISONE |
| Gateway Wind Energy | Wind | 79 MW | withdrawn | 2008-09 | NYISO |
| Scotia Industrial Park | Other | 20 MW | withdrawn | 2009-11 | NYISO |
| Johnstown Solar | Solar | 20 MW | withdrawn | 2018-11 | NYISO |
| ELP Rotterdam Solar | Solar | 20 MW | withdrawn | 2020-06 | NYISO |
| 18405 Scotch Ridge | Solar | 20 MW | withdrawn | 2021-08 | NYISO |
| Mariaville 2 Solar | Solar | 2 MW | withdrawn | 2015-05 | NYISO |
| Princetown - Rotterdam 230 | Other | — | withdrawn | 2013-06 | NYISO |
Large-load connection requests in this county
Requests to connect large new demand — data centres, industry, electrification — as distinct from generation. 1 recorded here.
| Request | Capacity | Status | Queue | Stated end use |
|---|---|---|---|---|
| GE Vernova 2690 Balltown Road High Yard Upgrade | 20 MW | active | NYISO | RD |
494 of the 545 large-load requests we hold state no end use at all, so most cannot be attributed to any industry. Where this table says “not stated”, that is the filing’s own silence, not our omission.
How this county ranks
Schenectady County ranks #1451 of 1,607 US counties by capacity currently queued, and #55 of 57 in New York.
Other New York counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Kings County | 7 | 2.7 GW |
| Suffolk County | 21 | 2.5 GW |
| Genesee County | 5 | 1.2 GW |
| Franklin County | 6 | 950 MW |
| Chautauqua County | 6 | 881 MW |
| Dutchess County | 5 | 854 MW |
| Montgomery County | 6 | 790 MW |
| Steuben County | 5 | 788 MW |
Go deeper on Schenectady County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Schenectady County on the map County reports All of New York