Data centers and new power in Madison County, NY

242 MW of new power is waiting to connect to the grid in Madison County, NY — 3 active requests. Typical wait: 5.7 years. 2 projects are built, 24 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Madison County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Madison County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Madison County right now.

242 MW
of new power is waiting to connect
3 projects asked. Not yet approved. Roughly what 193,000 homes use.
0 MW
has actually been built
2 projects switched on so far.
5.7 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 7%
  • Still waiting 10%
  • Withdrawn 83%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Madison County.

What kind of power is asking to connect

  • Solar 58%
  • Wind 42%

By capacity requested. Data as of 14 October 2026.

All the numbers

29 requests ever filed
Pending applications
3
of 29 ever filed
Capacity queued
242 MW
requested, not committed
Already built
0 MW
2 projects connected
Built vs decided
7.7%
24 withdrawn
Median wait
5.7 yr
for applications still pending
Connected capacity
118 MW
indicator, see note

Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built20 MW6.9%
Still waiting3242 MW10.3%
Withdrawn24922 MW82.8%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar1140 MW
Wind2102 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
NYISONYISO cluster request window
Class Year deliverability construct plus the new cluster process.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Ditch Creek SolarBatteries200 MWwithdrawn2022-04NYISO
Oxbow Hill SolarSolar140 MWactive2019-03NYISO
Hoffman Falls Wind 2Wind102 MWwithdrawn2022-02NYISO
Rolling Upland Wind Farm LLCWind80 MWwithdrawn2023-04NYISO
Stockbridge WindWind73 MWwithdrawn2014-08NYISO
Rolling Upland WindWind73 MWwithdrawn2015-12NYISO
Hoffman Falls WindWind72 MWactive2021-01NYISO
Rolling Upland WindWind60 MWwithdrawn2009-01NYISO
New Boston Solar LLCBatteries50 MWwithdrawn2021-07NYISO
West Hill WindfarmWind32 MWwithdrawn2004-04NYISO
Hoffman Falls Wind 2Wind30 MWactive2024-08NYISO
Blue Hill WindWind25 MWwithdrawn2020-11NYISO
Champagne StorageBatteries20 MWwithdrawn2017-05NYISO
Admiral Wind LLCWind20 MWwithdrawn2017-08NYISO
Madison County SolarSolar20 MWwithdrawn2019-05NYISO

How Madison County compares

#860 in the US · #32 in NY

Madison County ranks #860 of 1,607 US counties by power waiting to connect, and #32 of 57 in New York.

CountyWaitingCapacity queued
Suffolk County273.7 GW
Kings County83.1 GW
Orange County101.6 GW
Ulster County111.3 GW
Steuben County81.3 GW
Dutchess County71.1 GW
Nassau County21.1 GW
Genesee County4926 MW

Common questions about power in Madison County

How long does it take to get power for a data center in Madison County, NY?

The median wait for a project still in the interconnection queue in Madison County is 5.7 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Madison County have reached energization and 24 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Madison County, NY?

242 MW is currently requested across 3 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Madison County, NY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New York policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Madison County — NYISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.