Data centers and new power in Herkimer County, NY

450 MW of new power is waiting to connect to the grid in Herkimer County, NY — 6 active requests. Typical wait: 4.1 years. 1 projects are built, 23 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Herkimer County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Herkimer County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Herkimer County right now.

450 MW
of new power is waiting to connect
6 projects asked. Not yet approved. Roughly what 360,000 homes use.
74 MW
has actually been built
1 projects switched on so far.
4.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 3%
  • Still waiting 20%
  • Withdrawn 77%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Herkimer County.

What kind of power is asking to connect

  • Solar 59%
  • Wind 41%

By capacity requested. Data as of 14 October 2026.

All the numbers

30 requests ever filed
Pending applications
6
of 30 ever filed
Capacity queued
450 MW
requested, not committed
Already built
74 MW
1 projects connected
Built vs decided
4.2%
23 withdrawn
Median wait
4.1 yr
for applications still pending
Connected capacity
138 MW
indicator, see note

Source: interconnection queues published by NYISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built174 MW3.3%
Still waiting6450 MW20.0%
Withdrawn232.3 GW76.7%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar5265 MW
Wind1185 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
NYISONYISO cluster request window
Class Year deliverability construct plus the new cluster process.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Diamond SolarSolar500 MWwithdrawn2022-03NYISO
Columbia Solar Energy CenterSolar350 MWwithdrawn2019-05NYISO
Rocksdrift Energy CenterSolar300 MWwithdrawn2021-06NYISO
Swift SolarBatteries300 MWwithdrawn2022-06NYISO
117656 North Creek Solar+StorageBatteries207 MWwithdrawn2023-09NYISO
Rolling Hills WindWind185 MWactive2026-07NYISO
Rolling Hills SolarSolar185 MWactive2026-08NYISO
Orion Energy NY IWind100 MWwithdrawn2004-10NYISO
Goldenrod SolarSolar90 MWwithdrawn2018-08NYISO
Little Falls Solar & BESSBatteries83 MWwithdrawn2023-02NYISO
Jordanville WindWind80 MWwithdrawn2005-04NYISO
Fairfield Wind ProjectWind74 MWcompleted2004-09NYISO
NY48 - Diamond SolarSolar60 MWwithdrawn2021-05NYISO
Dry Lots WindWind33 MWwithdrawn2011-10NYISO
HelmerBatteries21 MWwithdrawn2019-11NYISO

Big new power users asking to connect

2 on record

Requests to connect large new customers — data centers, factories, electrification — rather than power plants.

RequestCapacityStatusQueueStated use
Incremental Load Request for Remington Factory Redevelopment400 MWactiveNYISODAT
Remington Factory Redevelopment100 MWactiveNYISODAT

Most of these filings do not say what the power is for. “Not stated” is the filing's silence, not ours.

How Herkimer County compares

#663 in the US · #25 in NY

Herkimer County ranks #663 of 1,607 US counties by power waiting to connect, and #25 of 57 in New York.

CountyWaitingCapacity queued
Suffolk County273.7 GW
Kings County83.1 GW
Orange County101.6 GW
Ulster County111.3 GW
Steuben County81.3 GW
Dutchess County71.1 GW
Nassau County21.1 GW
Genesee County4926 MW

Common questions about power in Herkimer County

How long does it take to get power for a data center in Herkimer County, NY?

The median wait for a project still in the interconnection queue in Herkimer County is 4.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Herkimer County have reached energization and 23 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Herkimer County, NY?

450 MW is currently requested across 6 active interconnection requests, and 74 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Herkimer County, NY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New York policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Herkimer County — NYISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Herkimer County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Herkimer County on the map County reports All of New York