Data centers and new power in Prince George County, VA

18 MW of new power is waiting to connect to the grid in Prince George County, VA — 1 active requests. Typical wait: 5.7 years. 1 projects are built, 17 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Prince George County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Prince George County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Prince George County right now.

18 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 14,000 homes use.
150 MW
has actually been built
1 projects switched on so far.
5.7 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 5%
  • Still waiting 5%
  • Withdrawn 85%
  • Paused 5%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Prince George County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

20 requests ever filed
Pending applications
1
of 20 ever filed
Capacity queued
18 MW
requested, not committed
Already built
150 MW
1 projects connected
Built vs decided
5.6%
17 withdrawn
Median wait
5.7 yr
for applications still pending
Connected capacity
587 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built1150 MW5.0%
Still waiting118 MW5.0%
Withdrawn171.2 GW85.0%
Paused1—5.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar118 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Poe-Suffolk 115kVNatural gas155 MWwithdrawn2011-08PJM
Hopewell-Surry 230kVSolar150 MWcompleted2016-04PJM
Poe-Suffolk 115kVNatural gas135 MWwithdrawn2011-04PJM
Disputanta-Poe 115 kVSolar100 MWsuspended2018-09PJM
Spruance Genco, LLCSolar100 MWwithdrawn2021-01PJM
Bakers Pond 115 kVSolar100 MWwithdrawn2021-03PJM
Polyester S/S 230kVBatteries100 MWwithdrawn2022-03PJM
Appomattox ESCBatteries100 MWwithdrawn2022-03PJM
Disputanta-Poe 115 kVSolar100 MWwithdrawn2023-03PJM
Hopewell-Surry 230kVSolar80 MWwithdrawn2015-04PJM
Disputanta-Waverly 115kVSolar60 MWwithdrawn2017-02PJM
Bakers Pond DP 115 kVSolar60 MWwithdrawn2020-09PJM
AH2-139Batteries50 MWwithdrawn2022-02PJM
AH2-141Batteries50 MWwithdrawn2022-02PJM
Disputanta - Bakers Pond 115 kVBatteries50 MWwithdrawn2022-07PJM

How Prince George County compares

#1226 in the US · #52 in VA

Prince George County ranks #1226 of 1,607 US counties by power waiting to connect, and #52 of 71 in Virginia.

Common questions about power in Prince George County

How long does it take to get power for a data center in Prince George County, VA?

The median wait for a project still in the interconnection queue in Prince George County is 5.7 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Prince George County have reached energization and 17 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Prince George County, VA?

18 MW is currently requested across 1 active interconnection requests, and 150 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Prince George County, VA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Virginia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Prince George County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Prince George County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Prince George County on the map County reports All of Virginia