Data centers and new power in Fluvanna County, VA

2.6 GW of new power is waiting to connect to the grid in Fluvanna County, VA — 3 active requests. Typical wait: 1.5 years. 1 projects are built, 23 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Fluvanna County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Fluvanna County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Fluvanna County right now.

2.6 GW
of new power is waiting to connect
3 projects asked. Not yet approved. Roughly what 2 million homes use.
1.0 GW
has actually been built
1 projects switched on so far.
1.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 4%
  • Still waiting 11%
  • Withdrawn 85%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Fluvanna County.

What kind of power is asking to connect

  • Solar 61%
  • Natural gas 39%

By capacity requested. Data as of 14 October 2026.

All the numbers

27 requests ever filed
Pending applications
3
of 27 ever filed
Capacity queued
2.6 GW
requested, not committed
Already built
1.0 GW
1 projects connected
Built vs decided
4.2%
23 withdrawn
Median wait
1.5 yr
for applications still pending
Connected capacity
1.0 GW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built11.0 GW3.7%
Still waiting32.6 GW11.1%
Withdrawn232.6 GW85.2%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar21.6 GW
Natural gas11.0 GW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Cunningham 500kVNatural gas1.0 GWcompleted2015-10PJM
Cunningham 500 kVNatural gas1.0 GWactive2025-06PJM
Cunningham 500kVNatural gas920 MWwithdrawn2015-10PJM
Cunningham 500 kVSolar776 MWactive2025-04PJM
Cunningham 500 kVSolar776 MWactive2025-04PJM
Cunningham - Elmont 500 kVSolar149 MWwithdrawn2021-05PJM
Cunningham - Elmont 500 kV IISolar149 MWwithdrawn2021-05PJM
Cunningham - Elmont 500 kV IIIBatteries149 MWwithdrawn2021-09PJM
Cunningham - Elmont 500 kV IVBatteries149 MWwithdrawn2021-09PJM
Fork Union-Mt. Eagle 230 kVSolar130 MWwithdrawn2020-04PJM
Kidds Store-Fort Union 115 kVSolar128 MWwithdrawn2019-09PJM
Kidds Store - Sherwood 115 kVBatteries110 MWwithdrawn2021-03PJM
Bremo 115 kVBatteries100 MWwithdrawn2022-10PJM
Fork Union 230 kVSolar85 MWwithdrawn2021-03PJM
Sherwood - Kidds Store 115 kVSolar80 MWwithdrawn2021-03PJM

How Fluvanna County compares

#138 in the US · #2 in VA

Fluvanna County ranks #138 of 1,607 US counties by power waiting to connect, and #2 of 71 in Virginia.

Common questions about power in Fluvanna County

How long does it take to get power for a data center in Fluvanna County, VA?

The median wait for a project still in the interconnection queue in Fluvanna County is 1.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Fluvanna County have reached energization and 23 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Fluvanna County, VA?

2.6 GW is currently requested across 3 active interconnection requests, and 1.0 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Fluvanna County, VA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Virginia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Fluvanna County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Fluvanna County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Fluvanna County on the map County reports All of Virginia