Data centers and new power in Henrico County, VA

20 MW of new power is waiting to connect to the grid in Henrico County, VA — 1 active requests. Typical wait: 5.6 years. 9 projects are built, 6 withdrawn. Data as of 14 October 2026.

Live here?

How far is it from your house?

QTS Richmond 1 is in Henrico County and uses about as much electricity as 190,000 homes.

22 public schools are within 5 miles of it, 2 within one mile. Counted from the facility, not from any home. School list: US Department of Education.

Plus 2 more mapped in this county.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Henrico County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Henrico County right now.

20 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 16,000 homes use.
485 MW
has actually been built
9 projects switched on so far.
5.6 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 56%
  • Still waiting 6%
  • Withdrawn 38%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Henrico County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

16 requests ever filed
Pending applications
1
of 16 ever filed
Capacity queued
20 MW
requested, not committed
Already built
485 MW
9 projects connected
Built vs decided
60.0%
6 withdrawn
Median wait
5.6 yr
for applications still pending
Connected capacity
398 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built9485 MW56.2%
Still waiting120 MW6.2%
Withdrawn665 MW37.5%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar120 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Darbytown 230kVNatural gas92 MWcompleted2007-07PJM
Darbytown 230kVNatural gas92 MWcompleted2007-07PJM
Darbytown 230kVNatural gas92 MWcompleted2007-07PJM
Darbytown 230kVNatural gas92 MWcompleted2007-07PJM
Spruance NUG 230kVNatural gas66 MWcompleted2018-03PJM
Turner 34.5 kVSolar20 MWwithdrawn2017-08PJM
Elko 34.5 kVSolar20 MWcompleted2017-11PJM
Charles CitySolar20 MWwithdrawn2018-02PJM
Turner 34.5 kVSolar20 MWactive2021-02PJM
Elko 34.5kVSolar19 MWcompleted2017-03PJM
Northeast 34.5kVNatural gas14 MWwithdrawn2007-01PJM
Northeast 34.5kVNatural gas8 MWcompleted2008-05PJM
Darbytown 230 kVBatteries5 MWwithdrawn2021-08PJM
Mountain Road 34.5kVNatural gas4 MWcompleted2009-07PJM
Darbytown 230 kV IIBatteries4 MWwithdrawn2021-08PJM

How Henrico County compares

#1220 in the US · #51 in VA

Henrico County ranks #1220 of 1,607 US counties by power waiting to connect, and #51 of 71 in Virginia.

Common questions about power in Henrico County

How long does it take to get power for a data center in Henrico County, VA?

The median wait for a project still in the interconnection queue in Henrico County is 5.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 9 projects in Henrico County have reached energization and 6 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Henrico County, VA?

20 MW is currently requested across 1 active interconnection requests, and 485 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Henrico County, VA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Virginia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Henrico County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Henrico County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Henrico County on the map County reports All of Virginia