Data centers and new power in Morrow County, OR

6.6 GW of new power is waiting to connect to the grid in Morrow County, OR — 22 active requests. Typical wait: 4.9 years. 6 projects are built, 82 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Morrow County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Morrow County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Morrow County right now.

6.6 GW
of new power is waiting to connect
22 projects asked. Not yet approved. Roughly what 5.3 million homes use.
1.1 GW
has actually been built
6 projects switched on so far.
4.9 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 5%
  • Still waiting 19%
  • Withdrawn 70%
  • Paused 6%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Morrow County.

What kind of power is asking to connect

  • Solar 67%
  • Batteries 20%
  • Natural gas 8%
  • Wind 5%

By capacity requested. Data as of 14 October 2026.

All the numbers

117 requests ever filed
Pending applications
22
of 117 ever filed
Capacity queued
6.6 GW
requested, not committed
Already built
1.1 GW
6 projects connected
Built vs decided
6.8%
82 withdrawn
Median wait
4.9 yr
for applications still pending
Connected capacity
1.9 GW
indicator, see note

Source: interconnection queues published by BPA, PacifiCorp. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built61.1 GW5.1%
Still waiting226.6 GW18.8%
Withdrawn8224.0 GW70.1%
Paused7—6.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar154.4 GW
Batteries31.3 GW
Natural gas3542 MW
Wind1300 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
G0966Solar1.3 GWwithdrawn2023-10BPA
G0960Solar1.3 GWwithdrawn2023-10BPA
G0962Solar1.3 GWwithdrawn2023-10BPA
G0964Solar1.3 GWwithdrawn2023-10BPA
G0781Solar1.3 GWwithdrawn2022-08BPA
G0678Solar1.2 GWactive2021-06BPA
G0963Batteries661 MWactive2023-10BPA
G1000Solar660 MWwithdrawn2023-11BPA
G0961Batteries650 MWwithdrawn2023-10BPA
G0959Batteries650 MWwithdrawn2023-10BPA
G0952Batteries650 MWwithdrawn2023-10BPA
G0786Batteries650 MWwithdrawn2022-08BPA
G0785Solar650 MWwithdrawn2022-08BPA
G0782Batteries650 MWwithdrawn2022-08BPA
National Energy and Gas TxNatural gas620 MWwithdrawn2001-07BPA

Big new power users asking to connect

10 on record

Requests to connect large new customers — data centers, factories, electrification — rather than power plants.

RequestCapacityStatusQueueStated use
Longhorn-McNary 230 kV Loop2.2 GWactiveBPAnot stated
Industrial Load Phase 21.2 GWwithdrawnBPAnot stated
Longhorn 230 kV Substation750 MWactiveBPAnot stated
Steelhead 230 kV600 MWactiveBPAnot stated
PDX-1 and PDX-4 Data Centers - Phase 2225 MWactiveBPAnot stated
Industrial Load150 MWactiveBPAnot stated
Morrow Flat120 MWenergizedBPAnot stated
PDX-2 Data Center - Phase 2117 MWactiveBPAnot stated
DLB2105 MWactiveBPAnot stated
Dalreed Substation72 MWenergizedBPAnot stated

Most of these filings do not say what the power is for. “Not stated” is the filing's silence, not ours.

How Morrow County compares

#28 in the US · #3 in OR

Morrow County ranks #28 of 1,607 US counties by power waiting to connect, and #3 of 31 in Oregon.

CountyWaitingCapacity queued
Sherman County2611.4 GW
Wasco County188.6 GW
Crook County316.3 GW
Klamath County135.0 GW
Jefferson County214.2 GW
Umatilla County163.5 GW
Gilliam County143.2 GW
Lake County202.8 GW

Common questions about power in Morrow County

How long does it take to get power for a data center in Morrow County, OR?

The median wait for a project still in the interconnection queue in Morrow County is 4.9 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 6 projects in Morrow County have reached energization and 82 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Morrow County, OR?

6.6 GW is currently requested across 22 active interconnection requests, and 1.1 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Morrow County, OR a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Oregon policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Morrow County — BPA, PacifiCorp — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Morrow County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Morrow County on the map County reports All of Oregon