Data centers and new power in Marshall County, IN
200 MW of new power is waiting to connect to the grid in Marshall County, IN — 1 active requests. Typical wait: 4.6 years. 0 projects are built, 11 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Marshall County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Marshall County
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Marshall County right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Marshall County.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
12 requests ever filed
Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still waiting | 1 | 200 MW | 8.3% |
| Withdrawn | 11 | 3.0 GW | 91.7% |
| Paused | 0 | — | 0.0% |
Waiting to connect, by type of power
| Type | Projects | Capacity requested |
|---|---|---|
| Solar | 1 | 200 MW |
Key dates for projects here
1 dated · next closes 2027-09-10 (MISO)
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| MISO | MISO DPP-2026 Definitive Planning Phase application deadline Attachment X of the tariff and BPM-015. | 2027-09-10 | confirmed source |
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 12 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Dumont - Greentown 765 kV | Solar | 600 MW | withdrawn | 2021-03 | PJM |
| Dumont - Greentown 765 kV | Batteries | 600 MW | withdrawn | 2021-03 | PJM |
| Dumont-Greentown 765 kV | Solar | 400 MW | withdrawn | 2021-03 | PJM |
| BURR OAK - LEESBURG 345.0kV | Solar | 300 MW | withdrawn | 2024-04 | MISO |
| Dumont-Sorensen 345kV | Wind | 252 MW | withdrawn | 2011-03 | PJM |
| HIPLE | Solar | 200 MW | active | 2022-03 | MISO |
| Dumont-Greentown 765 kV | Solar | 200 MW | withdrawn | 2021-02 | PJM |
| Burr Oak 138kV | Solar | 150 MW | withdrawn | 2020-06 | MISO |
| Burr Oak 138kV | Solar | 140 MW | withdrawn | 2022-09 | MISO |
| BURR OAK - PLYMOUTH 138.0kV | Solar + battery | 130 MW | withdrawn | 2022-09 | MISO |
| BURR OAK - EAST WINAMAC 138.0 kV | Solar | 123 MW | withdrawn | 2025-04 | MISO |
| PLYMOUTH - KOSCIUSKO & LEESBURG & KOSCIUSKO CO REMC - NORTHWEST 138.0kV | Solar | 110 MW | withdrawn | 2024-04 | MISO |
How Marshall County compares
#917 in the US · #36 in IN
Marshall County ranks #917 of 1,607 US counties by power waiting to connect, and #36 of 57 in Indiana.
| County | Waiting | Capacity queued |
|---|---|---|
| Sullivan County | 20 | 6.4 GW |
| Pulaski County | 10 | 3.2 GW |
| Vermillion County | 4 | 2.4 GW |
| White County | 13 | 2.1 GW |
| Fountain County | 4 | 1.4 GW |
| Blackford County | 7 | 1.3 GW |
| St. Joseph County | 4 | 1.2 GW |
| Greene County | 6 | 1.2 GW |
Common questions about power in Marshall County
How long does it take to get power for a data center in Marshall County, IN?
The median wait for a project still in the interconnection queue in Marshall County is 4.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Marshall County have reached energization and 11 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Marshall County, IN?
200 MW is currently requested across 1 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Marshall County, IN a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Indiana policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Marshall County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.
Go deeper on Marshall County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Marshall County on the map County reports All of Indiana