Data centers and new power in Monroe County, AR
0 MW of new power is waiting to connect to the grid in Monroe County, AR — 0 active requests. 2 projects are built, 11 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Monroe County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Monroe County
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Monroe County right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Monroe County.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
13 requests ever filed
Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 2 | 300 MW | 15.4% |
| Still waiting | 0 | 0 MW | 0.0% |
| Withdrawn | 11 | 1.2 GW | 84.6% |
| Paused | 0 | — | 0.0% |
Waiting to connect, by type of power
Key dates for projects here
no dated windows published
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 13 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| RITCHIE SWYD - TARLETON 230.0kV | Solar | 400 MW | withdrawn | 2024-04 | MISO |
| Brinkley East - Aubrey 230 kV Line | Solar | 200 MW | completed | 2017-06 | MISO |
| Brinkley East - Clarendon 115 kV | Solar | 160 MW | withdrawn | 2022-09 | MISO |
| Brinkley East - Clarendon 115kV Line | Solar | 100 MW | withdrawn | 2019-04 | MISO |
| J907 230kV Sub, Brinkley East - Aubrey 230 kV Line | Solar | 100 MW | completed | 2019-04 | MISO |
| Brinkley East to Clarendon 115 kV | Solar | 100 MW | withdrawn | 2021-09 | MISO |
| Brinkley West Substation 115kV | Solar + battery | 100 MW | withdrawn | 2021-08 | MISO |
| BRINKLEY WEST - BRINKLEY EAST 115kV Line | Solar | 100 MW | withdrawn | 2022-09 | MISO |
| Clarendon - Brinkley East 115kV Line | Solar | 90 MW | withdrawn | 2019-04 | MISO |
| Cotton Plant- Brinkley West 115KV | Solar | 64 MW | withdrawn | 2022-09 | MISO |
| Brinkley East - Aubrey 230 kV line | Solar | 50 MW | withdrawn | 2017-06 | MISO |
| Brinkley East to Clarendon 115 kV | Solar | 6 MW | withdrawn | 2020-06 | MISO |
| Brinkley East to Clarendon 115 kV | Solar | 0 MW | withdrawn | 2021-09 | MISO |
How Monroe County compares
#1269 in the US · #34 in AR
Monroe County ranks #1269 of 1,607 US counties by power waiting to connect, and #34 of 34 in Arkansas.
| County | Waiting | Capacity queued |
|---|---|---|
| Crittenden County | 7 | 1.8 GW |
| Mississippi County | 7 | 1.7 GW |
| Jefferson County | 4 | 1.2 GW |
| Jackson County | 4 | 1.2 GW |
| Calhoun County | 3 | 1.1 GW |
| Craighead County | 4 | 950 MW |
| Ouachita County | 4 | 901 MW |
| Phillips County | 6 | 890 MW |
Common questions about power in Monroe County
How long does it take to get power for a data center in Monroe County, AR?
We do not yet have a median wait for Monroe County. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Monroe County have reached energization and 11 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Monroe County, AR?
0 MW is currently requested across 0 active interconnection requests, and 300 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Monroe County, AR a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Arkansas policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Monroe County — the utilities in this area — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.
Go deeper on Monroe County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Monroe County on the map County reports All of Arkansas