Wisconsin interconnection queue

70 interconnection applications are pending in Wisconsin, requesting 14.5 GW of new generating capacity across 18 counties, as of 15 August 2026. That places Wisconsin #31 of 47 states by capacity queued.

Pending applications
70
of 248 ever filed
Capacity queued
14.5 GW
requested, not committed
Already built
9.5 GW
62 connected
Built vs decided
34.8%
116 withdrawn
Counties in the queue
18
with five or more filings
Large load requested
none recorded
0 requests

Source: the interconnection queues of every transmission provider operating in Wisconsin. Parsed and normalised by Watt Street. Data as of 15 August 2026.

Which queues serve Wisconsin

Queue or utilityApplicationsCapacity pending
MISO24714.5 GW
PJM10 MW

What is waiting in Wisconsin, by fuel

FuelProjectsCapacity requested
Solar416.7 GW
Gas156.5 GW
Wind5760 MW
Unknown7357 MW
Hybrid2180 MW

Counties with the most capacity queued

CountyPendingCapacity queuedAlready built
Kenosha County61.9 GW350 MW
Walworth County41.6 GW0 MW
Portage County51.6 GW398 MW
Dane County31.3 GW950 MW
Columbia County61.3 GW522 MW
Fond du Lac County2625 MW0 MW
Rock County5510 MW719 MW
Waushara County4330 MW99 MW
Barron County3295 MW200 MW
Marathon County2270 MW99 MW
Wood County2250 MW300 MW
Sheboygan County2250 MW225 MW
Grant County2205 MW345 MW
Clark County1190 MW0 MW
Green County2185 MW150 MW
Jefferson County2180 MW224 MW
Lafayette County198 MW300 MW
St. Croix County00 MW100 MW

Data centre campuses recorded in Wisconsin

CampusOperatorReported demand
Microsoft Fairwater WisconsinMicrosoft369 MW

A campus is tagged as a data centre by our classification, not by the operator’s own statement. 44 of the 72 campuses we hold carry coordinates, so only those can be mapped.