Data centers and new power in Rock County, WI

510 MW of new power is waiting to connect to the grid in Rock County, WI — 5 active requests. Typical wait: 4.1 years. 7 projects are built, 2 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Rock County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Rock County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Rock County right now.

510 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 408,000 homes use.
719 MW
has actually been built
7 projects switched on so far.
4.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 50%
  • Still waiting 36%
  • Withdrawn 14%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Rock County.

What kind of power is asking to connect

  • Natural gas 60%
  • Solar 34%
  • Not stated 6%

By capacity requested. Data as of 14 October 2026.

All the numbers

14 requests ever filed
Pending applications
5
of 14 ever filed
Capacity queued
510 MW
requested, not committed
Already built
719 MW
7 projects connected
Built vs decided
77.8%
2 withdrawn
Median wait
4.1 yr
for applications still pending
Connected capacity
1.8 GW
indicator, see note

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built7719 MW50.0%
Still waiting5510 MW35.7%
Withdrawn2140 MW14.3%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas2305 MW
Solar2172 MW
Not stated133 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 14 by size
ProjectTypeCapacityStatusFiledQueue
RCEC Bradford - W. Darien 138kV LineSolar250 MWcompleted2017-06MISO
Rock River 138 kV Substations 1 (6 RICE) and 2 (5 RICE)Natural gas205 MWactive2022-09MISO
Sunrise 138 kV SubstationSolar200 MWcompleted2019-04MISO
Townline RoadNatural gas100 MWactive2022-09MISO
Beloit GatewaySolar100 MWactive2022-09MISO
Wempletown - Rockdale 345kV Line TapSolar99 MWcompleted2019-04MISO
J1304 POI 138 kV SubstationSolar75 MWwithdrawn2020-06MISO
New J1377 ATC Switching StationSolar72 MWactive2025-10MISO
Paddock - Townline Rd 138 kV Line TapSolar65 MWwithdrawn2018-03MISO
Paddock - Townline Road 138kV LineSolar65 MWcompleted2019-04MISO
Sheepskin 69 kV SubstationSolar50 MWcompleted2018-03MISO
Townline Rd. - Paddock 138kVNot stated33 MWactive2022-08MISO
New Kitty Hawk 345kV substationNatural gas30 MWcompleted2016-11MISO
Sheepskin 69kVNot stated25 MWcompleted2022-05MISO

How Rock County compares

#608 in the US · #7 in WI

Rock County ranks #608 of 1,607 US counties by power waiting to connect, and #7 of 18 in Wisconsin.

CountyWaitingCapacity queued
Kenosha County61.9 GW
Portage County61.7 GW
Walworth County41.6 GW
Dane County31.3 GW
Columbia County61.3 GW
Fond du Lac County2625 MW
Waushara County4330 MW
Barron County3295 MW

Common questions about power in Rock County

How long does it take to get power for a data center in Rock County, WI?

The median wait for a project still in the interconnection queue in Rock County is 4.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 7 projects in Rock County have reached energization and 2 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Rock County, WI?

510 MW is currently requested across 5 active interconnection requests, and 719 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Rock County, WI a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Wisconsin policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Rock County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Rock County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Rock County on the map County reports All of Wisconsin