Data centers and new power in Zavala County, TX

692 MW of new power is waiting to connect to the grid in Zavala County, TX — 6 active requests. Typical wait: 0.8 years. 1 projects are built, 4 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Zavala County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Zavala County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Zavala County right now.

692 MW
of new power is waiting to connect
6 projects asked. Not yet approved. Roughly what 554,000 homes use.
206 MW
has actually been built
1 projects switched on so far.
0.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 9%
  • Still waiting 55%
  • Withdrawn 36%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Zavala County.

What kind of power is asking to connect

  • Batteries 82%
  • Solar 18%

By capacity requested. Data as of 14 October 2026.

All the numbers

11 requests ever filed
Pending applications
6
of 11 ever filed
Capacity queued
692 MW
requested, not committed
Already built
206 MW
1 projects connected
Built vs decided
20.0%
4 withdrawn
Median wait
0.8 yr
for applications still pending

Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built1206 MW9.1%
Still waiting6692 MW54.5%
Withdrawn4385 MW36.4%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries4571 MW
Solar2121 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
ERCOTERCOT Batch 1 large load interconnection - applications not yet dated
Successor cycle to Batch Zero under PGRR145.
No date published yetconfirmed source
ERCOTERCOT generation interconnection — rolling
Not FERC-jurisdictional.
Open all year — no cut-offunconfirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
ERCOTTexas SB 6 - large load curtailment protocol and equipment (PURA section 39.170(a))
All new large-load interconnections must carry ERCOT-controlled curtailment equipment.
Open all year — no cut-offconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 11 by size
ProjectTypeCapacityStatusFiledQueue
Bramble Energy CenterBatteries225 MWactive2026-01ERCOT
McLean (Shakes) SolarSolar206 MWcompleted2017-05ERCOT
SunShiner ESSBatteries200 MWactive2026-01ERCOT
GirasolSolar200 MWwithdrawn2020-05ERCOT
OCI SunShiner SolarSolar130 MWwithdrawn2023-02ERCOT
Flying Kite BessBatteries105 MWactive2027-01ERCOT
Flying Kite SolarSolar80 MWactive2025-01ERCOT
Peridot StorageBatteries50 MWwithdrawn2023-05ERCOT
La Mancha Solar SLFSolar41 MWactive2027-01ERCOT
La Mancha Storage SLFBatteries41 MWactive2027-01ERCOT
BARTLESVILLE SolarSolar4 MWwithdrawn2019-08ERCOT

How Zavala County compares

#516 in the US · #143 in TX

Zavala County ranks #516 of 1,607 US counties by power waiting to connect, and #143 of 183 in Texas.

CountyWaitingCapacity queued
Pecos County5521.2 GW
Brazoria County5511.7 GW
Milam County339.2 GW
Wharton County409.1 GW
Jack County188.6 GW
Hill County238.0 GW
Reeves County217.8 GW
Wilbarger County207.0 GW

Common questions about power in Zavala County

How long does it take to get power for a data center in Zavala County, TX?

The median wait for a project still in the interconnection queue in Zavala County is 0.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Zavala County have reached energization and 4 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Zavala County, TX?

692 MW is currently requested across 6 active interconnection requests, and 206 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Zavala County, TX a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Texas policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Zavala County — ERCOT — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.