Data centers and new power in Milam County, TX

9.2 GW of new power is waiting to connect to the grid in Milam County, TX — 33 active requests. Typical wait: 2.8 years. 4 projects are built, 6 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Milam County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Milam County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Milam County right now.

9.2 GW
of new power is waiting to connect
33 projects asked. Not yet approved. Roughly what 7.4 million homes use.
548 MW
has actually been built
4 projects switched on so far.
2.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 9%
  • Still waiting 73%
  • Withdrawn 13%
  • Paused 4%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Milam County.

What kind of power is asking to connect

  • Solar 44%
  • Batteries 33%
  • Natural gas 23%

By capacity requested. Data as of 14 October 2026.

All the numbers

45 requests ever filed
Pending applications
33
of 45 ever filed
Capacity queued
9.2 GW
requested, not committed
Already built
548 MW
4 projects connected
Built vs decided
40.0%
6 withdrawn
Median wait
2.8 yr
for applications still pending
Connected capacity
990 MW
indicator, see note

Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built4548 MW8.9%
Still waiting339.2 GW73.3%
Withdrawn6714 MW13.3%
Paused2—4.4%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar174.1 GW
Batteries143.0 GW
Natural gas22.1 GW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
ERCOTERCOT Batch 1 large load interconnection - applications not yet dated
Successor cycle to Batch Zero under PGRR145.
No date published yetconfirmed source
ERCOTERCOT generation interconnection — rolling
Not FERC-jurisdictional.
Open all year — no cut-offunconfirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
ERCOTTexas SB 6 - large load curtailment protocol and equipment (PURA section 39.170(a))
All new large-load interconnections must carry ERCOT-controlled curtailment equipment.
Open all year — no cut-offconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Sandow Lakes Energy StationNatural gas1.3 GWactive2027-01ERCOT
MilamStation Power Secured Gas GenerationNatural gas846 MWactive2029-01ERCOT
Scorpius SolarSolar600 MWactive2026-01ERCOT
Capoterra BESSBatteries600 MWsuspended2022-06ERCOT
CapoterraSolar598 MWsuspended2022-06ERCOT
Betel Storage IBatteries500 MWactive2026-01ERCOT
Betel Storage IIBatteries500 MWactive2026-01ERCOT
Aquila SolarSolar500 MWactive2026-01ERCOT
ORION BRANGUS STORAGEOther355 MWwithdrawn2022-11ERCOT
Sandow SolarSolar287 MWactive2022-01ERCOT
Sypert Branch Solar ProjectSolar261 MWactive2024-01ERCOT
Champs Elysees BESSBatteries256 MWactive2027-01ERCOT
San Gabriel SolarSolar255 MWactive2028-01ERCOT
Mandorla SolarSolar254 MWcompleted2020-01ERCOT
Eastbell Milam SolarSolar245 MWactive2021-01ERCOT

How Milam County compares

#11 in the US · #3 in TX

Milam County ranks #11 of 1,607 US counties by power waiting to connect, and #3 of 183 in Texas.

CountyWaitingCapacity queued
Pecos County5521.2 GW
Brazoria County5511.7 GW
Wharton County409.1 GW
Jack County188.6 GW
Hill County238.0 GW
Reeves County217.8 GW
Wilbarger County207.0 GW
Mitchell County166.9 GW

Common questions about power in Milam County

How long does it take to get power for a data center in Milam County, TX?

The median wait for a project still in the interconnection queue in Milam County is 2.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 4 projects in Milam County have reached energization and 6 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Milam County, TX?

9.2 GW is currently requested across 33 active interconnection requests, and 548 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Milam County, TX a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Texas policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Milam County — ERCOT — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.