Victoria County, TX interconnection queue
16 interconnection applications are pending in Victoria County, TX, requesting 4.2 GW of new generating capacity, as of 15 August 2026. 1 projects have been built here and 7 have been withdrawn since 2017.
Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Victoria County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Battery | 10 | 1.8 GW |
| Gas | 1 | 1.3 GW |
| Solar | 4 | 949 MW |
| Wind | 1 | 277 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 1 | 100 MW | 3.7% |
| Still pending | 16 | 4.2 GW | 59.3% |
| Withdrawn | 7 | 456 MW | 25.9% |
| Suspended | 3 | — | 11.1% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Cerulean Phase 2 – CCGT | Gas | 1.3 GW | active | 2029-01 | ERCOT |
| Bayside Solar | Solar | 509 MW | suspended | 2021-02 | ERCOT |
| Bayside BESS | Battery | 508 MW | suspended | 2022-03 | ERCOT |
| HyFuels Calhoun Solar | Solar | 302 MW | active | 2026-01 | ERCOT |
| Crossroads Wind | Wind | 277 MW | active | 2026-01 | ERCOT |
| Leopard BESS | Battery | 264 MW | active | 2027-01 | ERCOT |
| Iguala Solar | Solar | 250 MW | active | 2023-01 | ERCOT |
| Iguala Solar | Solar | 250 MW | suspended | 2020-10 | ERCOT |
| Marcos Solar SLF | Solar | 216 MW | active | 2027-01 | ERCOT |
| Oak Belt Storage | Battery | 210 MW | active | 2029-01 | ERCOT |
| Calico BESS | Battery | 205 MW | active | 2027-01 | ERCOT |
| HyFuels Iron Horse Solar | Solar | 201 MW | withdrawn | 2024-03 | ERCOT |
| Arpeggio BESS | Battery | 201 MW | active | 2028-01 | ERCOT |
| Goldhill Energy Storage | Battery | 201 MW | active | 2026-01 | ERCOT |
| Oak Belt Solar | Solar | 181 MW | active | 2029-01 | ERCOT |
How this county ranks
Victoria County ranks #68 of 1,607 US counties by capacity currently queued, and #33 of 183 in Texas.
Other Texas counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Pecos County | 55 | 21.2 GW |
| Brazoria County | 55 | 11.7 GW |
| Milam County | 33 | 9.2 GW |
| Wharton County | 40 | 9.1 GW |
| Jack County | 18 | 8.6 GW |
| Hill County | 23 | 8.0 GW |
| Reeves County | 21 | 7.8 GW |
| Wilbarger County | 20 | 7.0 GW |
Go deeper on Victoria County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.