Mitchell County, TX interconnection queue
16 interconnection applications are pending in Mitchell County, TX, requesting 6.9 GW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 8 have been withdrawn since 2013.
Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Mitchell County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Battery | 9 | 3.8 GW |
| Solar | 5 | 1.8 GW |
| Wind | 2 | 1.3 GW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 16 | 6.9 GW | 64.0% |
| Withdrawn | 8 | 1.3 GW | 32.0% |
| Suspended | 1 | — | 4.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Zeus Mitchell BESS | Battery | 1.0 GW | active | 2025-01 | ERCOT |
| Zeus Mitchell BESS II | Battery | 1.0 GW | active | 2026-01 | ERCOT |
| Zeus Spade Wind | Wind | 987 MW | active | 2026-01 | ERCOT |
| Zeus Mitchell Solar | Solar | 805 MW | active | 2025-01 | ERCOT |
| FGE Texas 1 Gas | Gas | 743 MW | withdrawn | 2013-04 | ERCOT |
| FGE Texas 2 Gas | Gas | 743 MW | suspended | 2014-02 | ERCOT |
| Rosenix Solar | Solar | 510 MW | active | 2029-01 | ERCOT |
| Zeus Spade BESS | Battery | 446 MW | active | 2026-01 | ERCOT |
| Rabbit Hollow Energy Storage | Battery | 342 MW | active | 2028-01 | ERCOT |
| Prairie Power Wind | Wind | 303 MW | active | 2028-01 | ERCOT |
| Rosenix Storage | Battery | 250 MW | active | 2029-01 | ERCOT |
| Sunflower Valley Storage | Battery | 206 MW | active | 2027-01 | ERCOT |
| Sepik BESS | Battery | 205 MW | active | 2023-01 | ERCOT |
| Charbray Solar | Solar | 200 MW | withdrawn | 2016-07 | ERCOT |
| Johnson Grass Solar | Solar | 196 MW | active | 2027-01 | ERCOT |
How this county ranks
Mitchell County ranks #26 of 1,607 US counties by capacity currently queued, and #9 of 183 in Texas.
Other Texas counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Pecos County | 55 | 21.2 GW |
| Brazoria County | 55 | 11.7 GW |
| Milam County | 33 | 9.2 GW |
| Wharton County | 40 | 9.1 GW |
| Jack County | 18 | 8.6 GW |
| Hill County | 23 | 8.0 GW |
| Reeves County | 21 | 7.8 GW |
| Wilbarger County | 20 | 7.0 GW |
Go deeper on Mitchell County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.