Data centers and new power in Goliad County, TX

2.7 GW of new power is waiting to connect to the grid in Goliad County, TX — 14 active requests. Typical wait: 2.8 years. 1 projects are built, 2 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Goliad County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Goliad County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Goliad County right now.

2.7 GW
of new power is waiting to connect
14 projects asked. Not yet approved. Roughly what 2.1 million homes use.
301 MW
has actually been built
1 projects switched on so far.
2.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 6%
  • Still waiting 78%
  • Withdrawn 11%
  • Paused 6%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Goliad County.

What kind of power is asking to connect

  • Solar 47%
  • Batteries 29%
  • Natural gas 25%

By capacity requested. Data as of 14 October 2026.

All the numbers

18 requests ever filed
Pending applications
14
of 18 ever filed
Capacity queued
2.7 GW
requested, not committed
Already built
301 MW
1 projects connected
Built vs decided
33.3%
2 withdrawn
Median wait
2.8 yr
for applications still pending
Connected capacity
922 MW
indicator, see note

Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built1301 MW5.6%
Still waiting142.7 GW77.8%
Withdrawn2204 MW11.1%
Paused1—5.6%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar61.2 GW
Batteries7765 MW
Natural gas1655 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
ERCOTERCOT Batch 1 large load interconnection - applications not yet dated
Successor cycle to Batch Zero under PGRR145.
No date published yetconfirmed source
ERCOTERCOT generation interconnection — rolling
Not FERC-jurisdictional.
Open all year — no cut-offunconfirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
ERCOTTexas SB 6 - large load curtailment protocol and equipment (PURA section 39.170(a))
All new large-load interconnections must carry ERCOT-controlled curtailment equipment.
Open all year — no cut-offconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Coleto Creek - Fuel Change OnlyNatural gas655 MWactive2026-01ERCOT
Diablo Campo StorageBatteries314 MWactive2027-01ERCOT
Peregrine SolarSolar301 MWcompleted2020-01ERCOT
Tulsita SolarSolar256 MWactive2021-01ERCOT
Kuy Creek Solar 1 SLFSolar235 MWactive2028-01ERCOT
Angel City SolarSolar221 MWactive2027-01ERCOT
Lucas Solar SLFSolar204 MWwithdrawn2022-07ERCOT
Keys Hollow Solar Phase II SLFSolar201 MWactive2024-01ERCOT
KEYS HOLLOW SOLAR SLFSolar201 MWactive2024-01ERCOT
Kuy Creek Storage 1 SLFBatteries151 MWactive2028-01ERCOT
PEREGRINE BESSBatteries150 MWactive2023-01ERCOT
Peregrine BESS 2Batteries150 MWactive2025-01ERCOT
Double A Solar SLFSolar133 MWactive2027-01ERCOT
Coleto Creek ESS AdditionBatteries100 MWsuspended2019-12ERCOT
Keys Hollow Storage Phase II SLFBatteries0 MWactive2024-01ERCOT

How Goliad County compares

#132 in the US · #55 in TX

Goliad County ranks #132 of 1,607 US counties by power waiting to connect, and #55 of 183 in Texas.

CountyWaitingCapacity queued
Pecos County5521.2 GW
Brazoria County5511.7 GW
Milam County339.2 GW
Wharton County409.1 GW
Jack County188.6 GW
Hill County238.0 GW
Reeves County217.8 GW
Wilbarger County207.0 GW

Common questions about power in Goliad County

How long does it take to get power for a data center in Goliad County, TX?

The median wait for a project still in the interconnection queue in Goliad County is 2.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Goliad County have reached energization and 2 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Goliad County, TX?

2.7 GW is currently requested across 14 active interconnection requests, and 301 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Goliad County, TX a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Texas policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Goliad County — ERCOT — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Goliad County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Goliad County on the map County reports All of Texas