Data centers and new power in Ellis County, TX

5.9 GW of new power is waiting to connect to the grid in Ellis County, TX — 27 active requests. Typical wait: 4.3 years. 3 projects are built, 7 withdrawn. Data as of 14 October 2026.

Live here?

How far is it from your house?

Google Midlothian, run by Google, is in Ellis County and uses about as much electricity as 82,000 homes.

12 public schools are within 5 miles of it, 4 within one mile. Counted from the facility, not from any home. School list: US Department of Education.

Plus 1 more mapped in this county.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Ellis County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Ellis County right now.

5.9 GW
of new power is waiting to connect
27 projects asked. Not yet approved. Roughly what 4.7 million homes use.
372 MW
has actually been built
3 projects switched on so far.
4.3 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 8%
  • Still waiting 68%
  • Withdrawn 18%
  • Paused 8%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Ellis County.

What kind of power is asking to connect

  • Batteries 56%
  • Solar 28%
  • Natural gas 15%
  • Other 1%

By capacity requested. Data as of 14 October 2026.

All the numbers

40 requests ever filed
Pending applications
27
of 40 ever filed
Capacity queued
5.9 GW
requested, not committed
Already built
372 MW
3 projects connected
Built vs decided
30.0%
7 withdrawn
Median wait
4.3 yr
for applications still pending
Connected capacity
2.5 GW
indicator, see note

Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built3372 MW7.5%
Still waiting275.9 GW67.5%
Withdrawn7628 MW17.5%
Paused3—7.5%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries133.3 GW
Solar81.6 GW
Natural gas5898 MW
Other150 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
ERCOTERCOT Batch 1 large load interconnection - applications not yet dated
Successor cycle to Batch Zero under PGRR145.
No date published yetconfirmed source
ERCOTERCOT generation interconnection — rolling
Not FERC-jurisdictional.
Open all year — no cut-offunconfirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source
ERCOTTexas SB 6 - large load curtailment protocol and equipment (PURA section 39.170(a))
All new large-load interconnections must carry ERCOT-controlled curtailment equipment.
Open all year — no cut-offconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Kickstart Energy Storage VIBatteries1.0 GWactive2029-01ERCOT
Kickstart Energy Storage VBatteries999 MWactive2029-01ERCOT
Victory Ellis – GasNatural gas466 MWactive2029-01ERCOT
Victory Ellis–BESSBatteries453 MWactive2028-01ERCOT
Two Step SolarSolar402 MWactive2029-01ERCOT
Digital Ranch GasNatural gas378 MWactive2028-01ERCOT
Galaxy Solar 2Solar302 MWactive2028-01ERCOT
Blossomheath BESSBatteries301 MWwithdrawn2023-05ERCOT
Cumulus Grid BESSBatteries211 MWactive2024-01ERCOT
Galaxy Storage 2Batteries202 MWactive2028-01ERCOT
Oystercatcher SolarSolar198 MWactive2021-01ERCOT
Galaxy SolarSolar177 MWactive2027-01ERCOT
Sol Marina Energy CenterSolar175 MWactive2026-01ERCOT
Galaxy StorageBatteries155 MWactive2027-01ERCOT
Desert Willow BESSBatteries154 MWcompleted2021-02ERCOT

How Ellis County compares

#44 in the US · #18 in TX

Ellis County ranks #44 of 1,607 US counties by power waiting to connect, and #18 of 183 in Texas.

CountyWaitingCapacity queued
Pecos County5521.2 GW
Brazoria County5511.7 GW
Milam County339.2 GW
Wharton County409.1 GW
Jack County188.6 GW
Hill County238.0 GW
Reeves County217.8 GW
Wilbarger County207.0 GW

Common questions about power in Ellis County

How long does it take to get power for a data center in Ellis County, TX?

The median wait for a project still in the interconnection queue in Ellis County is 4.3 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 3 projects in Ellis County have reached energization and 7 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Ellis County, TX?

5.9 GW is currently requested across 27 active interconnection requests, and 372 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Ellis County, TX a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Texas policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Ellis County — ERCOT — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Ellis County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Ellis County on the map County reports All of Texas