Crane County, TX interconnection queue
13 interconnection applications are pending in Crane County, TX, requesting 2.9 GW of new generating capacity, as of 15 August 2026. 3 projects have been built here and 4 have been withdrawn since 2016.
Source: interconnection queues published by ERCOT. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Crane County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Battery | 8 | 1.6 GW |
| Solar | 5 | 1.4 GW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 3 | 506 MW | 14.3% |
| Still pending | 13 | 2.9 GW | 61.9% |
| Withdrawn | 4 | 718 MW | 19.0% |
| Suspended | 1 | — | 4.8% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Point Mountain Solar | Solar | 514 MW | withdrawn | 2019-08 | ERCOT |
| Western Flats Storage | Battery | 411 MW | active | 2026-01 | ERCOT |
| Western Flats Solar | Solar | 410 MW | active | 2026-01 | ERCOT |
| Cattle Drive Solar | Solar | 307 MW | active | 2029-01 | ERCOT |
| Tierra Loma Solar | Solar | 250 MW | active | 2029-01 | ERCOT |
| Soda Lake BESS 2 SLF | Battery | 205 MW | active | 2024-01 | ERCOT |
| Tri-X BESS 1 SLF | Battery | 205 MW | active | 2028-01 | ERCOT |
| Soda Lake BESS 1 | Battery | 204 MW | active | 2023-01 | ERCOT |
| Crossett Power Batt | Other | 203 MW | completed | 2020-06 | ERCOT |
| Soda Lake Solar 1 | Solar | 203 MW | withdrawn | 2016-10 | ERCOT |
| Soda Lake Solar 2 SLF | Solar | 202 MW | active | 2023-01 | ERCOT |
| Tri-X Solar 1 SLF | Solar | 202 MW | active | 2020-01 | ERCOT |
| BRP Pictor BESS | Battery | 201 MW | active | 2022-01 | ERCOT |
| Tierra Loma Storage | Battery | 200 MW | active | 2029-01 | ERCOT |
| Tri-County Solar | Solar | 178 MW | suspended | 2016-10 | ERCOT |
How this county ranks
Crane County ranks #117 of 1,607 US counties by capacity currently queued, and #52 of 183 in Texas.
Other Texas counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Pecos County | 55 | 21.2 GW |
| Brazoria County | 55 | 11.7 GW |
| Milam County | 33 | 9.2 GW |
| Wharton County | 40 | 9.1 GW |
| Jack County | 18 | 8.6 GW |
| Hill County | 23 | 8.0 GW |
| Reeves County | 21 | 7.8 GW |
| Wilbarger County | 20 | 7.0 GW |
Go deeper on Crane County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.