Data centers and new power in Bergen County, NJ

2.0 GW of new power is waiting to connect to the grid in Bergen County, NJ — 2 active requests. Typical wait: 6.0 years. 14 projects are built, 22 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Bergen County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Bergen County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Bergen County right now.

2.0 GW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 1.6 million homes use.
7.4 GW
has actually been built
14 projects switched on so far.
6.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 37%
  • Still waiting 5%
  • Withdrawn 58%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Bergen County.

What kind of power is asking to connect

  • Natural gas 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

38 requests ever filed
Pending applications
2
of 38 ever filed
Capacity queued
2.0 GW
requested, not committed
Already built
7.4 GW
14 projects connected
Built vs decided
38.9%
22 withdrawn
Median wait
6.0 yr
for applications still pending
Connected capacity
1.4 GW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built147.4 GW36.8%
Still waiting22.0 GW5.3%
Withdrawn224.2 GW57.9%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Natural gas22.0 GW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Bergen 138kVNatural gas1.4 GWactive2016-04PJM
BergenNatural gas1.3 GWcompleted2013-02PJM
BergenNatural gas1.2 GWcompleted2013-02PJM
Bergen 230kVNatural gas1.2 GWcompleted2013-04PJM
Bergen 230kVNatural gas1.2 GWcompleted2009-11PJM
Bergen 230kVNot stated1.0 GWwithdrawn2006-07PJM
Bergen 230kVNot stated800 MWwithdrawn2008-07PJM
West Hempfield 230kVNatural gas750 MWwithdrawn1999-02PJM
Bergen 138kVNatural gas736 MWwithdrawn2022-03PJM
Bergen 230kVNot stated673 MWcompleted2009-04PJM
Bergen 230kVNatural gas671 MWactive2025-04PJM
Bergen 230kVNot stated670 MWcompleted2005-07PJM
Bergen 230kVNot stated660 MWwithdrawn2014-08PJM
BergenNatural gas550 MWcompleted2001-03PJM
BergenNatural gas500 MWcompleted1997-04PJM

How Bergen County compares

#186 in the US · #2 in NJ

Bergen County ranks #186 of 1,607 US counties by power waiting to connect, and #2 of 21 in New Jersey.

CountyWaitingCapacity queued
Salem County32.8 GW
Union County21.6 GW
Hudson County2350 MW
Atlantic County3308 MW
Camden County1300 MW
Warren County7181 MW
Mercer County1170 MW
Cumberland County3149 MW

Common questions about power in Bergen County

How long does it take to get power for a data center in Bergen County, NJ?

The median wait for a project still in the interconnection queue in Bergen County is 6.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 14 projects in Bergen County have reached energization and 22 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Bergen County, NJ?

2.0 GW is currently requested across 2 active interconnection requests, and 7.4 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Bergen County, NJ a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Jersey policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Bergen County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Bergen County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Bergen County on the map County reports All of New Jersey