Data centers and new power in Atlantic County, NJ

308 MW of new power is waiting to connect to the grid in Atlantic County, NJ — 3 active requests. Typical wait: 6.5 years. 10 projects are built, 80 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Atlantic County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Atlantic County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Atlantic County right now.

308 MW
of new power is waiting to connect
3 projects asked. Not yet approved. Roughly what 246,000 homes use.
58 MW
has actually been built
10 projects switched on so far.
6.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 11%
  • Still waiting 3%
  • Withdrawn 86%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Atlantic County.

What kind of power is asking to connect

  • Batteries 88%
  • Solar 12%

By capacity requested. Data as of 14 October 2026.

All the numbers

93 requests ever filed
Pending applications
3
of 93 ever filed
Capacity queued
308 MW
requested, not committed
Already built
58 MW
10 projects connected
Built vs decided
11.1%
80 withdrawn
Median wait
6.5 yr
for applications still pending
Connected capacity
55 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built1058 MW10.8%
Still waiting3308 MW3.2%
Withdrawn8015.3 GW86.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries2270 MW
Solar138 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Larrabee Collector Station 230 kVWind2.1 GWwithdrawn2023-03PJM
Cardiff 230 kVWind1.5 GWwithdrawn2023-03PJM
Larrabee 230 kVWind1.1 GWwithdrawn2018-06PJM
Cardiff 230kVNot stated1.1 GWwithdrawn2018-03PJM
Missouri AveOil798 MWwithdrawn2007-09PJM
Cedar 230kVWind720 MWwithdrawn2011-02PJM
Cardiff 230 kV IWind605 MWwithdrawn2018-12PJM
Cardiff 230 kV IIWind605 MWwithdrawn2018-12PJM
Minotola 138 kVNatural gas575 MWwithdrawn2015-10PJM
BL England 138 kVWind552 MWwithdrawn2020-03PJM
Cardiff 230kVNatural gas450 MWwithdrawn2002-07PJM
CardiffNatural gas450 MWwithdrawn2004-02PJM
BL England 138 kVWind445 MWwithdrawn2018-12PJM
Oyster Creek 230 kV IIWind400 MWwithdrawn2019-03PJM
Cardiff 230kVWind350 MWwithdrawn2007-10PJM

How Atlantic County compares

#771 in the US · #5 in NJ

Atlantic County ranks #771 of 1,607 US counties by power waiting to connect, and #5 of 21 in New Jersey.

CountyWaitingCapacity queued
Salem County32.8 GW
Bergen County22.0 GW
Union County21.6 GW
Hudson County2350 MW
Camden County1300 MW
Warren County7181 MW
Mercer County1170 MW
Cumberland County3149 MW

Common questions about power in Atlantic County

How long does it take to get power for a data center in Atlantic County, NJ?

The median wait for a project still in the interconnection queue in Atlantic County is 6.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 10 projects in Atlantic County have reached energization and 80 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Atlantic County, NJ?

308 MW is currently requested across 3 active interconnection requests, and 58 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Atlantic County, NJ a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Jersey policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Atlantic County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Atlantic County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Atlantic County on the map County reports All of New Jersey