Vigo County, IN interconnection queue
5 interconnection applications are pending in Vigo County, IN, requesting 754 MW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 11 have been withdrawn since 2020.
Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Vigo County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 3 | 567 MW |
| Hybrid | 1 | 100 MW |
| Gas | 1 | 87 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 5 | 754 MW | 31.2% |
| Withdrawn | 11 | 1.9 GW | 68.8% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Sandford | Solar | 365 MW | active | 2025-02 | MISO |
| Sullivan - Dequine 345 kV | Other | 339 MW | withdrawn | 2021-03 | PJM |
| Sandford | Solar | 337 MW | withdrawn | 2025-02 | MISO |
| Wabash River-Whitesville South 230 kV | Solar | 220 MW | withdrawn | 2022-09 | MISO |
| SPELTERVILLE | Solar | 200 MW | withdrawn | 2024-04 | MISO |
| TH Pfizer Jct. - Worthington (HED) | Solar | 175 MW | withdrawn | 2020-06 | MISO |
| Other_ | Hybrid | 150 MW | withdrawn | 2024-04 | MISO |
| TH Pfizer Jct. - Worthington (HED) | Solar | 150 MW | withdrawn | 2024-04 | MISO |
| Sandford | Solar | 132 MW | active | 2024-04 | MISO |
| Wabash River-Whitesville South 230 kV | Solar | 100 MW | withdrawn | 2022-09 | MISO |
| Sandcut-Rockville 138kV | Solar | 100 MW | withdrawn | 2022-04 | MISO |
| Other_ | Hybrid | 100 MW | active | 2022-03 | MISO |
| TH Pfizer Jct. - Worthington (HED) | Solar | 90 MW | withdrawn | 2022-09 | MISO |
| SUGAR CREEK | Gas | 87 MW | active | 2024-12 | MISO |
| Sandford 345 kV | Solar | 70 MW | active | 2025-06 | MISO |
How this county ranks
Vigo County ranks #486 of 1,607 US counties by capacity currently queued, and #13 of 57 in Indiana.
Other Indiana counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Sullivan County | 20 | 6.4 GW |
| Pulaski County | 10 | 3.2 GW |
| Vermillion County | 4 | 2.4 GW |
| White County | 13 | 2.1 GW |
| Fountain County | 4 | 1.4 GW |
| Blackford County | 7 | 1.3 GW |
| St. Joseph County | 4 | 1.2 GW |
| Greene County | 6 | 1.2 GW |
Go deeper on Vigo County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.