Data centers and new power in Vigo County, IN

754 MW of new power is waiting to connect to the grid in Vigo County, IN — 5 active requests. Typical wait: 1.8 years. 0 projects are built, 11 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Vigo County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Vigo County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Vigo County right now.

754 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 603,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
1.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 31%
  • Withdrawn 69%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Vigo County.

What kind of power is asking to connect

  • Solar 75%
  • Solar + battery 13%
  • Natural gas 12%

By capacity requested. Data as of 14 October 2026.

All the numbers

16 requests ever filed
Pending applications
5
of 16 ever filed
Capacity queued
754 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
11 withdrawn
Median wait
1.8 yr
for applications still pending
Connected capacity
862 MW
indicator, see note

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting5754 MW31.2%
Withdrawn111.9 GW68.8%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar3567 MW
Solar + battery1100 MW
Natural gas187 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
SandfordSolar365 MWactive2025-02MISO
Sullivan - Dequine 345 kVOther339 MWwithdrawn2021-03PJM
SandfordSolar337 MWwithdrawn2025-02MISO
Wabash River-Whitesville South 230 kVSolar220 MWwithdrawn2022-09MISO
SPELTERVILLESolar200 MWwithdrawn2024-04MISO
TH Pfizer Jct. - Worthington (HED)Solar175 MWwithdrawn2020-06MISO
Other_Solar150 MWwithdrawn2024-04MISO
TH Pfizer Jct. - Worthington (HED)Solar150 MWwithdrawn2024-04MISO
SandfordSolar132 MWactive2024-04MISO
Wabash River-Whitesville South 230 kVSolar100 MWwithdrawn2022-09MISO
Sandcut-Rockville 138kVSolar100 MWwithdrawn2022-04MISO
Other_Solar + battery100 MWactive2022-03MISO
TH Pfizer Jct. - Worthington (HED)Solar90 MWwithdrawn2022-09MISO
SUGAR CREEKNatural gas87 MWactive2024-12MISO
Sandford 345 kVSolar70 MWactive2025-06MISO

How Vigo County compares

#488 in the US · #13 in IN

Vigo County ranks #488 of 1,607 US counties by power waiting to connect, and #13 of 57 in Indiana.

CountyWaitingCapacity queued
Sullivan County206.4 GW
Pulaski County103.2 GW
Vermillion County42.4 GW
White County132.1 GW
Fountain County41.4 GW
Blackford County71.3 GW
St. Joseph County41.2 GW
Greene County61.2 GW

Common questions about power in Vigo County

How long does it take to get power for a data center in Vigo County, IN?

The median wait for a project still in the interconnection queue in Vigo County is 1.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Vigo County have reached energization and 11 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Vigo County, IN?

754 MW is currently requested across 5 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Vigo County, IN a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Indiana policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Vigo County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Vigo County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Vigo County on the map County reports All of Indiana