Data centers and new power in Allen County, IN

400 MW of new power is waiting to connect to the grid in Allen County, IN — 5 active requests. Typical wait: 6.0 years. 0 projects are built, 16 withdrawn. Data as of 14 October 2026.

Live here?

How far is it from your house?

Google Fort Wayne, run by Google, is in Allen County.

44 public schools are within 5 miles of it, 3 within one mile. Counted from the facility, not from any home. School list: US Department of Education.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Allen County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Allen County right now.

400 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 320,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
6.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 24%
  • Withdrawn 76%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Allen County.

What kind of power is asking to connect

  • Solar 75%
  • Batteries 25%

By capacity requested. Data as of 14 October 2026.

All the numbers

21 requests ever filed
Pending applications
5
of 21 ever filed
Capacity queued
400 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
16 withdrawn
Median wait
6.0 yr
for applications still pending

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting5400 MW23.8%
Withdrawn161.9 GW76.2%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar3300 MW
Batteries2100 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Convoy-East Lima 345kVWind240 MWwithdrawn2007-07PJM
Lincoln-North DelphosWind200 MWwithdrawn2007-07PJM
Allen - RP Mone 345 kVSolar180 MWwithdrawn2021-09PJM
Allen - RP Mone 345 kVSolar180 MWwithdrawn2023-03PJM
Haviland-Tillman 138kVWind100 MWwithdrawn2006-06PJM
Allen 345 kVSolar100 MWactive2020-03PJM
Allen 345 kVSolar100 MWactive2020-09PJM
Tillman 138 kVSolar100 MWactive2020-09PJM
Sowers 138 kVSolar100 MWwithdrawn2020-09PJM
Allen 345 kVSolar100 MWwithdrawn2021-03PJM
Allen 345 kVSolar100 MWwithdrawn2021-03PJM
Sowers 138 kVSolar100 MWwithdrawn2021-03PJM
Coventry 138 kVBatteries100 MWwithdrawn2021-09PJM
Milan 138 kVBatteries100 MWwithdrawn2021-09PJM
Wayne Trace 138 kVBatteries100 MWwithdrawn2021-09PJM

How Allen County compares

#698 in the US · #19 in IN

Allen County ranks #698 of 1,607 US counties by power waiting to connect, and #19 of 57 in Indiana.

CountyWaitingCapacity queued
Sullivan County206.4 GW
Pulaski County103.2 GW
Vermillion County42.4 GW
White County132.1 GW
Fountain County41.4 GW
Blackford County71.3 GW
St. Joseph County41.2 GW
Greene County61.2 GW

Common questions about power in Allen County

How long does it take to get power for a data center in Allen County, IN?

The median wait for a project still in the interconnection queue in Allen County is 6.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Allen County have reached energization and 16 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Allen County, IN?

400 MW is currently requested across 5 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Allen County, IN a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Indiana policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Allen County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Allen County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Allen County on the map County reports All of Indiana