Data centers and new power in Carbon/Albany, WY

2.7 GW of new power is waiting to connect to the grid in Carbon/Albany, WY — 16 active requests. Typical wait: 4.5 years. 11 projects are built, 74 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Carbon/Albany itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Carbon/Albany

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Carbon/Albany right now.

2.7 GW
of new power is waiting to connect
16 projects asked. Not yet approved. Roughly what 2.1 million homes use.
1.7 GW
has actually been built
11 projects switched on so far.
4.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 11%
  • Still waiting 16%
  • Withdrawn 73%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Carbon/Albany.

What kind of power is asking to connect

  • Wind 56%
  • Solar 44%

By capacity requested. Data as of 14 October 2026.

All the numbers

101 requests ever filed
Pending applications
16
of 101 ever filed
Capacity queued
2.7 GW
requested, not committed
Already built
1.7 GW
11 projects connected
Built vs decided
12.9%
74 withdrawn
Median wait
4.5 yr
for applications still pending
Connected capacity
1.8 GW
indicator, see note

Source: interconnection queues published by PacifiCorp. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built111.7 GW10.9%
Still waiting162.7 GW15.8%
Withdrawn7421.6 GW73.3%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Wind111.5 GW
Solar51.2 GW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
177Wind1.5 GWwithdrawn2007-12PacifiCorp
C3-052Solar1.0 GWwithdrawn2023-05PacifiCorp
C1-25Solar900 MWwithdrawn2021-05PacifiCorp
C3-013Solar900 MWwithdrawn2023-04PacifiCorp
1174Solar750 MWwithdrawn2019-10PacifiCorp
1153Wind665 MWwithdrawn2019-08PacifiCorp
1173Wind625 MWwithdrawn2019-10PacifiCorp
C3-024Wind600 MWwithdrawn2023-05PacifiCorp
C3-025Wind600 MWwithdrawn2023-05PacifiCorp
1154Wind590 MWwithdrawn2019-08PacifiCorp
940Wind576 MWwithdrawn2017-08PacifiCorp
C2-34Wind506 MWwithdrawn2022-04PacifiCorp
1015Wind501 MWwithdrawn2018-03PacifiCorp
1016Wind501 MWwithdrawn2018-03PacifiCorp
191Wind500 MWwithdrawn2008-01PacifiCorp

How Carbon/Albany compares

#133 in the US · #3 in WY

Carbon/Albany ranks #133 of 1,607 US counties by power waiting to connect, and #3 of 12 in Wyoming.

CountyWaitingCapacity queued
Laramie County225.4 GW
Platte County123.4 GW
Converse County102.3 GW
Lincoln County51.8 GW
Sweetwater County21.2 GW
Albany County5964 MW
Campbell County3590 MW
Natrona County4409 MW

Common questions about power in Carbon/Albany

How long does it take to get power for a data center in Carbon/Albany, WY?

The median wait for a project still in the interconnection queue in Carbon/Albany is 4.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 11 projects in Carbon/Albany have reached energization and 74 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Carbon/Albany, WY?

2.7 GW is currently requested across 16 active interconnection requests, and 1.7 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Carbon/Albany, WY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Wyoming policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Carbon/Albany — PacifiCorp — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.