Duchesne County, UT interconnection queue
0 interconnection applications are pending in Duchesne County, UT, requesting 0 MW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 7 have been withdrawn since 2013.
Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Duchesne County, by fuel
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 0 | 0 MW | 0.0% |
| Withdrawn | 7 | 595 MW | 100.0% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| C4-024 | Battery | 150 MW | withdrawn | 2024-05 | PacifiCorp |
| C3-059 | Solar | 100 MW | withdrawn | 2023-05 | PacifiCorp |
| C3-117 | Solar | 100 MW | withdrawn | 2023-05 | PacifiCorp |
| C3-176 | Solar | 100 MW | withdrawn | 2023-05 | PacifiCorp |
| C4-084 | Solar | 100 MW | withdrawn | 2024-05 | PacifiCorp |
| 468 | Solar | 40 MW | withdrawn | 2013-02 | PacifiCorp |
| C3-118 | Solar | 5 MW | withdrawn | 2023-05 | PacifiCorp |
How this county ranks
Duchesne County ranks #1571 of 1,607 US counties by capacity currently queued, and #19 of 21 in Utah.
Other Utah counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Miller | 27 | 6.5 GW |
| Utah County | 29 | 6.0 GW |
| Emery County | 19 | 3.5 GW |
| Juab County | 15 | 3.2 GW |
| Salt Lake County | 11 | 2.3 GW |
| Iron County | 11 | 1.8 GW |
| Kane County | 3 | 1.1 GW |
| Washington County | 4 | 780 MW |
Go deeper on Duchesne County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.