3 interconnection applications are pending in Kane County, UT, requesting 1.1 GW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 4 have been withdrawn since 2015.
Source: interconnection queues published by N-C, PacifiCorp. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Kane County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 3 | 1.1 GW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 0 | 0 MW | 0.0% |
| Still pending | 3 | 1.1 GW | 42.9% |
| Withdrawn | 4 | 594 MW | 57.1% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| NC5-010 | Solar | 500 MW | active | 2024-03 | N-C |
| NC5-001 | Solar | 480 MW | active | 2015-05 | N-C |
| 710 | Solar | 204 MW | withdrawn | 2015-09 | PacifiCorp |
| 854 | Solar | 190 MW | withdrawn | 2017-03 | PacifiCorp |
| C3-127 | Solar | 100 MW | withdrawn | 2023-05 | PacifiCorp |
| C3-138 | Battery | 100 MW | withdrawn | 2023-05 | PacifiCorp |
| 805 | Solar | 95 MW | active | 2016-09 | PacifiCorp |
How this county ranks
Kane County ranks #355 of 1,607 US counties by capacity currently queued, and #7 of 21 in Utah.
Other Utah counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Miller | 27 | 6.5 GW |
| Utah County | 29 | 6.0 GW |
| Emery County | 19 | 3.5 GW |
| Juab County | 15 | 3.2 GW |
| Salt Lake County | 11 | 2.3 GW |
| Iron County | 11 | 1.8 GW |
| Washington County | 4 | 780 MW |
| Box Elder County | 5 | 765 MW |