Sign in

Sullivan County, MO interconnection queue

1 interconnection applications are pending in Sullivan County, MO, requesting 300 MW of new generating capacity, as of 15 August 2026. 0 projects have been built here and 5 have been withdrawn since 2011.

Pending applications
1
of 6 ever filed
Capacity queued
300 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
5 withdrawn
Median wait
1.3 yr
for applications still pending

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.

What is waiting in Sullivan County, by fuel

FuelProjectsCapacity requested
Solar1300 MW

Outcomes of every application filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still pending1300 MW16.7%
Withdrawn5621 MW83.3%
Suspended00.0%

Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.

The largest projects on file

ProjectFuelCapacityStatusFiledQueue
Other_Solar300 MWactive2025-04MISO
Other_Solar300 MWwithdrawn2025-04MISO
GI-46Wind89 MWwithdrawn2011-03AEC
GI-49Wind78 MWwithdrawn2013-06AEC
GI-56Wind78 MWwithdrawn2016-05AEC
GI-64Wind78 MWwithdrawn2018-02AEC

How this county ranks

Sullivan County ranks #789 of 1,607 US counties by capacity currently queued, and #12 of 26 in Missouri.

Other Missouri counties in the queue

CountyPendingCapacity queued
Randolph County133.5 GW
Clinton County41.4 GW
Clay County5850 MW
Jackson County6849 MW
Macon County3608 MW
Bollinger County3600 MW
Nodaway County2468 MW
New Madrid County6462 MW

Go deeper on Sullivan County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Sullivan County on the map County reports All of Missouri