New Madrid County, MO interconnection queue
6 interconnection applications are pending in New Madrid County, MO, requesting 462 MW of new generating capacity, as of 15 August 2026. 1 projects have been built here and 14 have been withdrawn since 2009.
Source: interconnection queues published by AEC, MISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in New Madrid County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 2 | 350 MW |
| Gas | 2 | 72 MW |
| Coal | 2 | 40 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 1 | 200 MW | 4.8% |
| Still pending | 6 | 462 MW | 28.6% |
| Withdrawn | 14 | 3.4 GW | 66.7% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| GI-106 | Solar | 350 MW | withdrawn | 2022-08 | AEC |
| GI-97 | Solar | 350 MW | withdrawn | 2022-01 | AEC |
| GI-72 | Solar | 300 MW | withdrawn | 2018-11 | AEC |
| GI-74 | Solar | 300 MW | withdrawn | 2018-12 | AEC |
| GI-75 | Solar | 300 MW | withdrawn | 2018-12 | AEC |
| GI-107 | Solar | 250 MW | withdrawn | 2022-08 | AEC |
| GI-71 | Solar | 250 MW | withdrawn | 2018-12 | AEC |
| GI-98 | Solar | 250 MW | withdrawn | 2022-01 | AEC |
| GI-62 | Solar | 202 MW | withdrawn | 2017-10 | AEC |
| Portageville - New Madrid 161kV Line | Solar | 200 MW | completed | 2017-06 | MISO |
| Marston 161 kV | Solar | 200 MW | active | 2025-08 | MISO |
| GEN-2017-202 | Solar | 200 MW | withdrawn | 2017-11 | SPP |
| GEN-2018-094 | Solar | 200 MW | withdrawn | 2018-11 | SPP |
| GEN-2018-113 | Solar | 200 MW | withdrawn | 2018-11 | SPP |
| GI-84 | Solar | 196 MW | withdrawn | 2019-08 | AEC |
How this county ranks
New Madrid County ranks #644 of 1,607 US counties by capacity currently queued, and #8 of 26 in Missouri.
Other Missouri counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Randolph County | 13 | 3.5 GW |
| Clinton County | 4 | 1.4 GW |
| Clay County | 5 | 850 MW |
| Jackson County | 6 | 849 MW |
| Macon County | 3 | 608 MW |
| Bollinger County | 3 | 600 MW |
| Nodaway County | 2 | 468 MW |
| Stoddard County | 2 | 425 MW |
Go deeper on New Madrid County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open New Madrid County on the map County reports All of Missouri