Data centers and new power in Tattnall County, GA

160 MW of new power is waiting to connect to the grid in Tattnall County, GA — 2 active requests. Typical wait: 5.0 years. 0 projects are built, 8 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Tattnall County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Tattnall County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Tattnall County right now.

160 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 128,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
5.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 20%
  • Withdrawn 80%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Tattnall County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

10 requests ever filed
Pending applications
2
of 10 ever filed
Capacity queued
160 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
8 withdrawn
Median wait
5.0 yr
for applications still pending
Connected capacity
4 MW
indicator, see note

Source: interconnection queues published by GTC. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting2160 MW20.0%
Withdrawn8557 MW80.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2160 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 10 by size
ProjectTypeCapacityStatusFiledQueue
25-IC-AVSolar150 MWwithdrawn—SOCO
RV SolarSolar100 MWactive2020-02GTC
IC-802Solar85 MWwithdrawn2019-08SOCO
IC-308Solar80 MWwithdrawn2013-07SOCO
IC-574Solar80 MWwithdrawn2017-01SOCO
SR MendesSolar60 MWactive2023-07GTC
IC-551Solar52 MWwithdrawn2016-12SOCO
IC-377Solar50 MWwithdrawn2014-05SOCO
IC-601Solar40 MWwithdrawn2017-02SOCO
IC-301Solar20 MWwithdrawn2013-06SOCO

How Tattnall County compares

#988 in the US · #37 in GA

Tattnall County ranks #988 of 1,607 US counties by power waiting to connect, and #37 of 61 in Georgia.

CountyWaitingCapacity queued
Heard County74.2 GW
Bartow County73.6 GW
Coweta County62.6 GW
Mitchell County62.4 GW
Monroe County12.0 GW
Hancock County42.0 GW
Effingham County131.9 GW
Sumter County51.4 GW

Common questions about power in Tattnall County

How long does it take to get power for a data center in Tattnall County, GA?

The median wait for a project still in the interconnection queue in Tattnall County is 5.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Tattnall County have reached energization and 8 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Tattnall County, GA?

160 MW is currently requested across 2 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Tattnall County, GA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Tattnall County — GTC — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.