Data centers and new power in Heard County, GA
4.2 GW of new power is waiting to connect to the grid in Heard County, GA — 7 active requests. Typical wait: 2.6 years. 2 projects are built, 4 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Heard County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Heard County
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Heard County right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Heard County.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
14 requests ever filed
Source: interconnection queues published by SOCO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 2 | 178 MW | 14.3% |
| Still waiting | 7 | 4.2 GW | 50.0% |
| Withdrawn | 4 | 3.1 GW | 28.6% |
| Paused | 1 | — | 7.1% |
Waiting to connect, by type of power
| Type | Projects | Capacity requested |
|---|---|---|
| Natural gas | 6 | 3.7 GW |
| Batteries | 1 | 500 MW |
Key dates for projects here
no dated windows published
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 15 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| SoCo-Wansley CC's | Natural gas | 1.2 GW | completed | — | SOCO |
| IC-206 | Natural gas | 1.2 GW | withdrawn | 2003-09 | SOCO |
| 25-IC-BH | Natural gas | 1.0 GW | withdrawn | — | SOCO |
| IC-1254a | Natural gas | 1.0 GW | active | 2024-03 | SOCO |
| IC-1254b | Natural gas | 1.0 GW | active | 2024-03 | SOCO |
| Tenaska Heard Co. | Natural gas | 900 MW | completed | — | SOCO |
| IC-1263 | Natural gas | 722 MW | active | 2024-03 | SOCO |
| IC-1264 | Natural gas | 722 MW | active | 2024-03 | SOCO |
| IC-1247 | Batteries | 500 MW | active | 2024-03 | SOCO |
| IC-1261 | Natural gas | 419 MW | withdrawn | 2024-03 | SOCO |
| IC-1262 | Natural gas | 419 MW | withdrawn | 2024-03 | SOCO |
| 25-IC-1333A | Natural gas | 129 MW | active | 2025-04 | SOCO |
| 25-IC-1333B | Natural gas | 129 MW | active | 2025-04 | SOCO |
| Hawk Road (aka Dynegy) | Natural gas | 100 MW | completed | 2023-12 | GTC |
| IC-1035 | Solar | 100 MW | suspended | 2022-05 | SOCO |
How Heard County compares
#69 in the US · #1 in GA
Heard County ranks #69 of 1,607 US counties by power waiting to connect, and #1 of 61 in Georgia.
| County | Waiting | Capacity queued |
|---|---|---|
| Bartow County | 7 | 3.6 GW |
| Coweta County | 6 | 2.6 GW |
| Mitchell County | 6 | 2.4 GW |
| Monroe County | 1 | 2.0 GW |
| Hancock County | 4 | 2.0 GW |
| Effingham County | 13 | 1.9 GW |
| Sumter County | 5 | 1.4 GW |
| Laurens County | 7 | 1.3 GW |
Common questions about power in Heard County
How long does it take to get power for a data center in Heard County, GA?
The median wait for a project still in the interconnection queue in Heard County is 2.6 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Heard County have reached energization and 4 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Heard County, GA?
4.2 GW is currently requested across 7 active interconnection requests, and 178 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Heard County, GA a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Heard County — SOCO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.
Go deeper on Heard County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.