Data centers and new power in Fulton County, GA

300 MW of new power is waiting to connect to the grid in Fulton County, GA — 2 active requests. Typical wait: 6.8 years. 0 projects are built, 6 withdrawn. Data as of 14 October 2026.

Live here?

How far is it from your house?

xAI QTS Atlanta, run by SpaceXAI, is in Fulton County and uses about as much electricity as 14,000 homes.

63 public schools are within 5 miles of it, 5 within one mile. Counted from the facility, not from any home. School list: US Department of Education.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Fulton County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Fulton County right now.

300 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 240,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
6.8 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 22%
  • Withdrawn 67%
  • Paused 11%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Fulton County.

What kind of power is asking to connect

  • Batteries 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

9 requests ever filed
Pending applications
2
of 9 ever filed
Capacity queued
300 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
6 withdrawn
Median wait
6.8 yr
for applications still pending
Connected capacity
59 MW
indicator, see note

Source: interconnection queues published by GTC. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting2300 MW22.2%
Withdrawn61.3 GW66.7%
Paused1—11.1%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Batteries2300 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 9 by size
ProjectTypeCapacityStatusFiledQueue
IC-974Batteries600 MWsuspended2021-07SOCO
IC-1117Batteries500 MWwithdrawn2023-02SOCO
Union City Storage IBatteries200 MWactive2019-12GTC
IC-1041Batteries200 MWwithdrawn2022-07SOCO
IC-1215Batteries200 MWwithdrawn2023-12SOCO
IC-830Batteries200 MWwithdrawn2019-10SOCO
Union City Storage IIBatteries100 MWactive2019-12GTC
IC-1268Batteries100 MWwithdrawn2024-03SOCO
IC-829Batteries100 MWwithdrawn2019-10SOCO

How Fulton County compares

#780 in the US · #28 in GA

Fulton County ranks #780 of 1,607 US counties by power waiting to connect, and #28 of 61 in Georgia.

CountyWaitingCapacity queued
Heard County74.2 GW
Bartow County73.6 GW
Coweta County62.6 GW
Mitchell County62.4 GW
Monroe County12.0 GW
Hancock County42.0 GW
Effingham County131.9 GW
Sumter County51.4 GW

Common questions about power in Fulton County

How long does it take to get power for a data center in Fulton County, GA?

The median wait for a project still in the interconnection queue in Fulton County is 6.8 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Fulton County have reached energization and 6 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Fulton County, GA?

300 MW is currently requested across 2 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Fulton County, GA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Fulton County — GTC — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Fulton County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Fulton County on the map County reports All of Georgia