Data centers and new power in Decatur County, GA

579 MW of new power is waiting to connect to the grid in Decatur County, GA — 3 active requests. Typical wait: 7.5 years. 4 projects are built, 16 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Decatur County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Decatur County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Decatur County right now.

579 MW
of new power is waiting to connect
3 projects asked. Not yet approved. Roughly what 463,000 homes use.
993 MW
has actually been built
4 projects switched on so far.
7.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 17%
  • Still waiting 12%
  • Withdrawn 67%
  • Paused 4%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Decatur County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

24 requests ever filed
Pending applications
3
of 24 ever filed
Capacity queued
579 MW
requested, not committed
Already built
993 MW
4 projects connected
Built vs decided
20.0%
16 withdrawn
Median wait
7.5 yr
for applications still pending
Connected capacity
637 MW
indicator, see note

Source: interconnection queues published by SOCO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built4993 MW16.7%
Still waiting3579 MW12.5%
Withdrawn162.5 GW66.7%
Paused1—4.2%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar3579 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
IC-046Natural gas550 MWwithdrawn—SOCO
Walton Bainbridge (aka E. Bainbr)Natural gas500 MWcompleted2023-12GTC
IC-862Solar400 MWwithdrawn2020-04SOCO
25-IC-ADSolar300 MWwithdrawn—SOCO
IC-789Solar260 MWactive2019-04SOCO
Cool SpringsSolar213 MWcompleted—SOCO
Decatur SolarSolar200 MWcompleted2018-08SOCO
IC-833Solar200 MWwithdrawn2019-10SOCO
IC-441Solar189 MWactive2016-02SOCO
IC-692Solar130 MWwithdrawn2018-04SOCO
IC-966Solar130 MWactive2021-06SOCO
IC-467Solar118 MWwithdrawn2016-07SOCO
IC-436Solar100 MWwithdrawn2016-02SOCO
IC-437Solar100 MWwithdrawn2016-02SOCO
IC-438Solar100 MWwithdrawn2016-02SOCO

How Decatur County compares

#573 in the US · #16 in GA

Decatur County ranks #573 of 1,607 US counties by power waiting to connect, and #16 of 61 in Georgia.

CountyWaitingCapacity queued
Heard County74.2 GW
Bartow County73.6 GW
Coweta County62.6 GW
Mitchell County62.4 GW
Monroe County12.0 GW
Hancock County42.0 GW
Effingham County131.9 GW
Sumter County51.4 GW

Common questions about power in Decatur County

How long does it take to get power for a data center in Decatur County, GA?

The median wait for a project still in the interconnection queue in Decatur County is 7.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 4 projects in Decatur County have reached energization and 16 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Decatur County, GA?

579 MW is currently requested across 3 active interconnection requests, and 993 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Decatur County, GA a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Decatur County — SOCO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Decatur County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Decatur County on the map County reports All of Georgia