Data centers and new power in Clarke-Jackson Co, GA
0 MW of new power is waiting to connect to the grid in Clarke-Jackson Co, GA — 0 active requests. 1 projects are built, 9 withdrawn. Data as of 14 October 2026.
Is one near your house?
We have not mapped a large AI data center inside Clarke-Jackson Co itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.
What is happening with electricity in Clarke-Jackson Co
Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Clarke-Jackson Co right now.
Where every request ever filed here ended up
Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Clarke-Jackson Co.
What kind of power is asking to connect
By capacity requested. Data as of 14 October 2026.
All the numbers
10 requests ever filed
Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.
Outcome of every request filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 1 | 4 MW | 10.0% |
| Still waiting | 0 | 0 MW | 0.0% |
| Withdrawn | 9 | 3.6 GW | 90.0% |
| Paused | 0 | — | 0.0% |
Waiting to connect, by type of power
Key dates for projects here
no dated windows published
| Queue | What closes | Closes | Standing |
|---|---|---|---|
| FERC | FERC large-load show cause — stakeholder comments on RTO responses Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70… | No date published yet | unconfirmed source |
| FERC | FERC RM26-4 — generic large-load rulemaking Still at ANOPR stage. | No date published yet | confirmed source |
| FERC | Georgia PSC - Georgia Power must file large-load contracts 30 days before execution A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed. | No date published yet | confirmed source |
A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.
The biggest projects on file
top 10 by size
| Project | Type | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| IC-014 | Natural gas | 620 MW | withdrawn | — | SOCO |
| IC-015 | Natural gas | 620 MW | withdrawn | — | SOCO |
| IC-016 | Natural gas | 620 MW | withdrawn | — | SOCO |
| IC-077 | Natural gas | 564 MW | withdrawn | — | SOCO |
| IC-131 | Natural gas | 564 MW | withdrawn | — | SOCO |
| IC-034 | Natural gas | 185 MW | withdrawn | — | SOCO |
| IC-035 | Natural gas | 185 MW | withdrawn | — | SOCO |
| IC-1186 | Batteries | 130 MW | withdrawn | 2023-10 | SOCO |
| IC-1181 | Batteries | 100 MW | withdrawn | 2023-10 | SOCO |
| Fall Line Hydro (aka Tallasee Shoals) | Hydro | 4 MW | completed | 2023-12 | GTC |
How Clarke-Jackson Co compares
#1284 in the US · #50 in GA
Clarke-Jackson Co ranks #1284 of 1,607 US counties by power waiting to connect, and #50 of 61 in Georgia.
| County | Waiting | Capacity queued |
|---|---|---|
| Heard County | 7 | 4.2 GW |
| Bartow County | 7 | 3.6 GW |
| Coweta County | 6 | 2.6 GW |
| Mitchell County | 6 | 2.4 GW |
| Monroe County | 1 | 2.0 GW |
| Hancock County | 4 | 2.0 GW |
| Effingham County | 13 | 1.9 GW |
| Sumter County | 5 | 1.4 GW |
Common questions about power in Clarke-Jackson Co
How long does it take to get power for a data center in Clarke-Jackson Co, GA?
We do not yet have a median wait for Clarke-Jackson Co. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 1 projects in Clarke-Jackson Co have reached energization and 9 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.
How much capacity is available in Clarke-Jackson Co, GA?
0 MW is currently requested across 0 active interconnection requests, and 4 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.
Is Clarke-Jackson Co, GA a good site for a data center?
This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Georgia policy page.
Where does the data on this page come from?
The interconnection queue published by the transmission providers serving Clarke-Jackson Co — the utilities in this area — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.