Data centers and new power in Walton County, FL

74 MW of new power is waiting to connect to the grid in Walton County, FL — 1 active requests. Typical wait: 6.7 years. 4 projects are built, 0 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Walton County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Walton County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Walton County right now.

74 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 60,000 homes use.
298 MW
has actually been built
4 projects switched on so far.
6.7 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 80%
  • Still waiting 20%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Walton County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

5 requests ever filed
Pending applications
1
of 5 ever filed
Capacity queued
74 MW
requested, not committed
Already built
298 MW
4 projects connected
Built vs decided
100.0%
0 withdrawn
Median wait
6.7 yr
for applications still pending
Connected capacity
298 MW
indicator, see note

Source: interconnection queues published by FPL. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built4298 MW80.0%
Still waiting174 MW20.0%
Withdrawn00 MW0.0%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar174 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 5 by size
ProjectTypeCapacityStatusFiledQueue
366BSolar74 MWcompleted2019-02FPL
369CSolar74 MWcompleted2019-09FPL
378GSolar74 MWcompleted2020-02FPL
378HSolar74 MWactive2020-02FPL
380ASolar74 MWcompleted2020-02FPL

How Walton County compares

#1154 in the US · #41 in FL

Walton County ranks #1154 of 1,607 US counties by power waiting to connect, and #41 of 48 in Florida.

CountyWaitingCapacity queued
Hendry County403.0 GW
Miami-Dade County32.7 GW
Osceola County92.0 GW
St. Lucie County241.8 GW
DeSoto County161.2 GW
Collier County151.1 GW
Charlotte County141.0 GW
Martin County141.0 GW

Common questions about power in Walton County

How long does it take to get power for a data center in Walton County, FL?

The median wait for a project still in the interconnection queue in Walton County is 6.7 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 4 projects in Walton County have reached energization and 0 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Walton County, FL?

74 MW is currently requested across 1 active interconnection requests, and 298 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Walton County, FL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Florida policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Walton County — FPL — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Walton County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.