Data centers and new power in Gilcrhist, FL

149 MW of new power is waiting to connect to the grid in Gilcrhist, FL — 2 active requests. Typical wait: 8.1 years. 4 projects are built, 15 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Gilcrhist itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Gilcrhist

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Gilcrhist right now.

149 MW
of new power is waiting to connect
2 projects asked. Not yet approved. Roughly what 119,000 homes use.
299 MW
has actually been built
4 projects switched on so far.
8.1 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 17%
  • Still waiting 8%
  • Withdrawn 62%
  • Paused 12%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Gilcrhist.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

24 requests ever filed
Pending applications
2
of 24 ever filed
Capacity queued
149 MW
requested, not committed
Already built
299 MW
4 projects connected
Built vs decided
21.1%
15 withdrawn
Median wait
8.1 yr
for applications still pending
Connected capacity
235 MW
indicator, see note

Source: interconnection queues published by Duke. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built4299 MW16.7%
Still waiting2149 MW8.3%
Withdrawn152.1 GW62.5%
Paused3—12.5%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2149 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
90Natural gas868 MWwithdrawn2008-07Duke
88Natural gas546 MWwithdrawn2008-04Duke
139Solar75 MWwithdrawn2016-04Duke
160Solar75 MWcompleted2016-12Duke
218CSolar75 MWwithdrawn2018-02Duke
262Solar75 MWwithdrawn2019-06Duke
294Solar75 MWwithdrawn2021-09Duke
295Solar75 MWcompleted2021-09Duke
300Solar75 MWwithdrawn2022-01Duke
154Solar74 MWcompleted2016-08Duke
171Solar74 MWactive2016-12Duke
174Solar74 MWcompleted2016-12Duke
283Solar74 MWsuspended2020-04Duke
286Solar74 MWactive2020-06Duke
324Solar74 MWsuspended2023-02Duke

How Gilcrhist compares

#1020 in the US · #29 in FL

Gilcrhist ranks #1020 of 1,607 US counties by power waiting to connect, and #29 of 48 in Florida.

CountyWaitingCapacity queued
Hendry County403.0 GW
Miami-Dade County32.7 GW
Osceola County92.0 GW
St. Lucie County241.8 GW
DeSoto County161.2 GW
Collier County151.1 GW
Charlotte County141.0 GW
Martin County141.0 GW

Common questions about power in Gilcrhist

How long does it take to get power for a data center in Gilcrhist, FL?

The median wait for a project still in the interconnection queue in Gilcrhist is 8.1 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 4 projects in Gilcrhist have reached energization and 15 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Gilcrhist, FL?

149 MW is currently requested across 2 active interconnection requests, and 299 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Gilcrhist, FL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Florida policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Gilcrhist — Duke — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Gilcrhist

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Gilcrhist on the map County reports All of Florida