San Bernardino County, CA interconnection queue
19 interconnection applications are pending in San Bernardino County, CA, requesting 7.3 GW of new generating capacity, as of 15 August 2026. 15 projects have been built here and 142 have been withdrawn since 2002.
Source: interconnection queues published by CAISO, LADWP, WAPA-DSW. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in San Bernardino County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Battery | 8 | 3.8 GW |
| Solar | 3 | 2.1 GW |
| Hybrid | 8 | 1.4 GW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 15 | 1.9 GW | 8.5% |
| Still pending | 19 | 7.3 GW | 10.8% |
| Withdrawn | 142 | 43.1 GW | 80.7% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Q92 | Solar | 1.6 GW | active | 2022-06 | LADWP |
| Withdrawn project | Solar | 1.4 GW | withdrawn | 2006-06 | CAISO |
| Withdrawn project | Solar | 1.2 GW | withdrawn | 2006-08 | CAISO |
| Withdrawn project | Solar | 1.1 GW | withdrawn | 2008-05 | CAISO |
| Withdrawn project | Solar | 1.0 GW | withdrawn | 2007-06 | CAISO |
| Withdrawn project | Solar | 1.0 GW | withdrawn | 2007-06 | CAISO |
| Q112 | Battery | 1.0 GW | active | 2024-10 | LADWP |
| Withdrawn project | Hybrid | 910 MW | withdrawn | 2014-04 | CAISO |
| Withdrawn project | Solar | 900 MW | withdrawn | 2008-05 | CAISO |
| Withdrawn project | Solar | 850 MW | withdrawn | 2005-05 | CAISO |
| Q31 | Gas | 850 MW | withdrawn | 2012-07 | LADWP |
| Withdrawn project | Solar | 750 MW | withdrawn | 2007-12 | CAISO |
| Withdrawn project | Gas | 698 MW | withdrawn | 2006-10 | CAISO |
| Withdrawn project | Solar | 635 MW | withdrawn | 2006-05 | CAISO |
| Withdrawn project | Solar | 612 MW | withdrawn | 2008-05 | CAISO |
How this county ranks
San Bernardino County ranks #21 of 1,607 US counties by capacity currently queued, and #4 of 42 in California.
Other California counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Los Angeles County | 33 | 15.0 GW |
| Kern County | 51 | 13.8 GW |
| Riverside County | 23 | 8.4 GW |
| Imperial County | 35 | 6.7 GW |
| Fresno County | 28 | 6.5 GW |
| Sacramento County | 16 | 3.6 GW |
| Kings County | 8 | 2.5 GW |
| Merced County | 10 | 2.5 GW |
Go deeper on San Bernardino County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open San Bernardino County on the map County reports All of California