Los Angeles County, CA interconnection queue
33 interconnection applications are pending in Los Angeles County, CA, requesting 15.0 GW of new generating capacity, as of 15 August 2026. 11 projects have been built here and 118 have been withdrawn since 2000.
Source: interconnection queues published by CAISO, LADWP. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Los Angeles County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Battery | 21 | 5.6 GW |
| Solar | 4 | 4.7 GW |
| Hybrid | 5 | 2.3 GW |
| Wind | 2 | 2.0 GW |
| Hydrogen | 1 | 346 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 11 | 1.5 GW | 6.8% |
| Still pending | 33 | 15.0 GW | 20.4% |
| Withdrawn | 118 | 24.4 GW | 72.8% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| Withdrawn project | Gas | 1.9 GW | withdrawn | 2012-04 | CAISO |
| Q98 | Solar | 1.5 GW | active | 2023-03 | LADWP |
| Q68 | Solar | 1.2 GW | active | 2019-03 | LADWP |
| ANGELENO SOLAR FARM | Hybrid | 1.1 GW | active | 2019-04 | CAISO |
| Withdrawn project | Gas | 1.0 GW | withdrawn | 2013-04 | CAISO |
| Q100 | Wind | 1.0 GW | active | 2023-04 | LADWP |
| Q101 | Wind | 1.0 GW | active | 2023-04 | LADWP |
| Q96 | Solar | 1.0 GW | active | 2023-03 | LADWP |
| Q97 | Solar | 1.0 GW | active | 2023-03 | LADWP |
| Withdrawn project | Gas | 910 MW | withdrawn | 2013-04 | CAISO |
| Withdrawn project | Solar | 840 MW | withdrawn | 2008-06 | CAISO |
| ANTELOPE SOLAR 2 | Hybrid | 650 MW | active | 2015-04 | CAISO |
| Withdrawn project | Gas | 614 MW | withdrawn | 2006-02 | CAISO |
| Withdrawn project | Gas | 610 MW | withdrawn | 2005-09 | CAISO |
| Withdrawn project | Hybrid | 600 MW | withdrawn | 2019-04 | CAISO |
How this county ranks
Los Angeles County ranks #4 of 1,607 US counties by capacity currently queued, and #1 of 42 in California.
Other California counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Kern County | 51 | 13.8 GW |
| Riverside County | 23 | 8.4 GW |
| San Bernardino County | 19 | 7.3 GW |
| Imperial County | 35 | 6.7 GW |
| Fresno County | 28 | 6.5 GW |
| Sacramento County | 16 | 3.6 GW |
| Kings County | 8 | 2.5 GW |
| Merced County | 10 | 2.5 GW |