Sanilac County, MI interconnection queue
7 interconnection applications are pending in Sanilac County, MI, requesting 1.4 GW of new generating capacity, as of 15 August 2026. 2 projects have been built here and 5 have been withdrawn since 2017.
Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Sanilac County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 6 | 1.2 GW |
| Wind | 1 | 220 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 2 | 493 MW | 14.3% |
| Still pending | 7 | 1.4 GW | 50.0% |
| Withdrawn | 5 | 950 MW | 35.7% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| GREENWOOD - RAPSON (BANNER) 345.0kV | Wind | 293 MW | completed | 2020-06 | MISO |
| GREENWOOD - RAPSON 345.0kV | Solar | 250 MW | active | 2025-03 | MISO |
| GREENWOOD - RAPSON 345.0kV | Wind | 220 MW | active | 2024-04 | MISO |
| J1557 Sub | Solar | 200 MW | active | 2022-09 | MISO |
| KILGORE - MICAH 120.0kV | Solar | 200 MW | active | 2024-04 | MISO |
| Greenwood - Rapson (Banner) 345 kV Line Tap | Solar | 200 MW | completed | 2019-04 | MISO |
| Greenwood - Banner 345kV Line Tap | Wind | 200 MW | withdrawn | 2017-06 | MISO |
| Banner-Rapson 345kV Transmission Line | Solar | 200 MW | withdrawn | 2021-08 | MISO |
| Greenwood-Rapson 345kV Transmission Line | Solar | 200 MW | withdrawn | 2021-08 | MISO |
| GREENWOOD - RAPSON 345.0kV | Solar | 200 MW | withdrawn | 2022-09 | MISO |
| GREENWOOD - RAPSON (BANNER) 345.0kV | Solar | 200 MW | active | 2024-04 | MISO |
| GREENWOOD - RAPSON (BANNER) 345.0kV | Solar | 185 MW | active | 2021-08 | MISO |
| Bennet 120kV Substation | Wind | 150 MW | withdrawn | 2019-04 | MISO |
| GREENWOOD - RAPSON 345.0kV | Solar | 135 MW | active | 2022-09 | MISO |
How this county ranks
Sanilac County ranks #278 of 1,607 US counties by capacity currently queued, and #9 of 42 in Michigan.
Other Michigan counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Monroe County | 7 | 3.9 GW |
| Huron County | 16 | 3.6 GW |
| Livingston County | 6 | 2.3 GW |
| Branch County | 7 | 2.3 GW |
| Van Buren County | 11 | 2.3 GW |
| Washtenaw County | 7 | 2.2 GW |
| Saginaw County | 10 | 1.8 GW |
| Genesee County | 4 | 1.4 GW |
Go deeper on Sanilac County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Sanilac County on the map County reports All of Michigan