1 interconnection applications are pending in Minidoka County, ID, requesting 56 MW of new generating capacity, as of 15 August 2026. 1 projects have been built here and 27 have been withdrawn since 2001.
Source: interconnection queues published by IP. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Minidoka County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Solar | 1 | 56 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 1 | 10 MW | 3.4% |
| Still pending | 1 | 56 MW | 3.4% |
| Withdrawn | 27 | 2.6 GW | 93.1% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| 685 | Solar | 300 MW | withdrawn | 2022-11 | IP |
| 764 | Solar | 300 MW | withdrawn | 2025-03 | IP |
| C2-83 | Solar | 300 MW | withdrawn | 2022-05 | PacifiCorp |
| 642 | Solar | 250 MW | withdrawn | 2022-03 | IP |
| 40 | Other | 200 MW | withdrawn | 2001-05 | IP |
| 677 | Solar | 200 MW | withdrawn | 2022-10 | IP |
| 769 | Solar | 199 MW | withdrawn | 2025-04 | IP |
| 652 | Battery | 180 MW | withdrawn | 2022-04 | IP |
| 768 | Solar | 150 MW | withdrawn | 2025-04 | IP |
| 684 | Solar | 145 MW | withdrawn | 2022-11 | IP |
| 682 | Solar | 100 MW | withdrawn | 2022-10 | IP |
| 770 | Solar | 56 MW | active | 2025-04 | IP |
| Black Hills Energy | Gas | 55 MW | withdrawn | 2001-06 | BPA |
| 28 | Solar | 28 MW | withdrawn | 2001-05 | IP |
| 30 | Solar | 28 MW | withdrawn | 2001-05 | IP |
Large-load connection requests in this county
Requests to connect large new demand — data centres, industry, electrification — as distinct from generation. 1 recorded here.
| Request | Capacity | Status | Queue | Stated end use |
|---|---|---|---|---|
| Rural Substation | 7 MW | active | BPA | not stated |
494 of the 545 large-load requests we hold state no end use at all, so most cannot be attributed to any industry. Where this table says “not stated”, that is the filing’s own silence, not our omission.
How this county ranks
Minidoka County ranks #1171 of 1,607 US counties by capacity currently queued, and #14 of 27 in Idaho.
Other Idaho counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Elmore County | 10 | 2.5 GW |
| Ada County | 11 | 2.0 GW |
| Bingham County | 8 | 1.8 GW |
| Power County | 4 | 1.6 GW |
| Owyhee County | 5 | 993 MW |
| Canyon County | 4 | 594 MW |
| Jerome County | 2 | 320 MW |
| Bannock County | 2 | 301 MW |