Data centers and new power in Power County, ID

1.6 GW of new power is waiting to connect to the grid in Power County, ID — 4 active requests. Typical wait: 3.0 years. 7 projects are built, 23 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Power County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Power County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Power County right now.

1.6 GW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 1.3 million homes use.
297 MW
has actually been built
7 projects switched on so far.
3.0 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 19%
  • Still waiting 11%
  • Withdrawn 64%
  • Paused 6%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Power County.

What kind of power is asking to connect

  • Solar 56%
  • Natural gas 25%
  • Wind 19%

By capacity requested. Data as of 14 October 2026.

All the numbers

36 requests ever filed
Pending applications
4
of 36 ever filed
Capacity queued
1.6 GW
requested, not committed
Already built
297 MW
7 projects connected
Built vs decided
23.3%
23 withdrawn
Median wait
3.0 yr
for applications still pending
Connected capacity
257 MW
indicator, see note

Source: interconnection queues published by IP, PacifiCorp. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built7297 MW19.4%
Still waiting41.6 GW11.1%
Withdrawn237.2 GW63.9%
Paused2—5.6%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar2900 MW
Natural gas1400 MW
Wind1300 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
63Other1.6 GWwithdrawn2001-09IP
662Solar1.0 GWsuspended2022-06IP
65Other778 MWwithdrawn2001-09IP
66Other778 MWwithdrawn2001-09IP
C2-45Solar600 MWactive2022-04PacifiCorp
C4-030Natural gas400 MWwithdrawn2024-05PacifiCorp
T2-040Natural gas400 MWactive2025-09PacifiCorp
573Solar300 MWactive2019-11IP
648Solar300 MWwithdrawn2022-03IP
658Solar300 MWwithdrawn2022-06IP
670Wind300 MWwithdrawn2022-10IP
711Solar300 MWwithdrawn2023-04IP
763Wind300 MWactive2025-03IP
783Solar300 MWwithdrawn2025-04IP
784Solar300 MWwithdrawn2025-04IP

How Power County compares

#239 in the US · #4 in ID

Power County ranks #239 of 1,607 US counties by power waiting to connect, and #4 of 27 in Idaho.

CountyWaitingCapacity queued
Elmore County102.5 GW
Ada County112.0 GW
Bingham County81.8 GW
Owyhee County5993 MW
Canyon County4594 MW
Jerome County2320 MW
Bannock County2301 MW
Kootenai County4255 MW

Common questions about power in Power County

How long does it take to get power for a data center in Power County, ID?

The median wait for a project still in the interconnection queue in Power County is 3.0 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 7 projects in Power County have reached energization and 23 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Power County, ID?

1.6 GW is currently requested across 4 active interconnection requests, and 297 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Power County, ID a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Idaho policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Power County — IP, PacifiCorp — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Power County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Power County on the map County reports All of Idaho