Data centers and new power in Ohio

22.2 GW of new power is waiting to connect to the grid in Ohio — 96 requests across 69 counties. That is the 19th largest amount of any state. 116 projects are built, 737 withdrawn. Data as of 14 October 2026.

The power picture

What is happening with electricity in Ohio

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Ohio right now.

22.2 GW
of new power is waiting to connect
96 projects asked. Not yet approved. Roughly what 17.8 million homes use.
49.9 GW
has actually been built
116 projects switched on so far.
737
projects gave up
Withdrawn before being built. Normal nationally.

Where every request ever filed here ended up

  • Built 12%
  • Still waiting 10%
  • Withdrawn 76%
  • Paused 2%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Ohio.

What kind of power is asking to connect

  • Solar 47%
  • Natural gas 38%
  • Batteries 13%
  • Wind 2%
  • Other 0%

By capacity requested. Data as of 14 October 2026.

All the numbers

966 requests ever filed
Waiting to connect
96
of 966 ever filed
Capacity requested
22.2 GW
asked for, not approved
Already built
49.9 GW
116 switched on
Built vs decided
13.6%
737 withdrawn
Counties involved
69
with five or more requests
Big new power users
none recorded
0 requests

Source: the interconnection queues of every transmission provider operating in Ohio. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar7210.4 GW
Natural gas118.5 GW
Batteries102.9 GW
Wind2438 MW
Other110 MW

Who runs the waiting list in Ohio

Grid operator or utilityRequestsCapacity pending
PJM96622.2 GW

Counties in Ohio

69 with power on the waiting list

Every county with at least five requests on file. Open one to check an address, or see the schools near any mapped data center.

CountyWaitingCapacity queuedAlready built
Madison County63.2 GW1.7 GW
Lorain County41.4 GW0 MW
Lawrence County11.4 GW3.8 GW
Carroll County11.3 GW1.5 GW
Wood County31.2 GW1.3 GW
Columbiana County11.2 GW1.2 GW
Licking County51.0 GW0 MW
Trumbull County1970 MW3.6 GW
Van Wert County3850 MW350 MW
Washington County1694 MW4.1 GW
Jackson County5670 MW0 MW
Highland County5658 MW550 MW
Harrison County2600 MW0 MW
Fairfield County4560 MW0 MW
Morrow County6514 MW0 MW
Hardin County4460 MW1.1 GW
Franklin County2450 MW7 MW
Union County2447 MW325 MW
Paulding County5437 MW578 MW
Preble County5368 MW0 MW
Wyandot County2320 MW0 MW
Clinton County1300 MW116 MW
Erie County1298 MW127 MW
Marion County3290 MW0 MW
Hancock County2250 MW3 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

Data center campuses recorded in Ohio

6 listed
CampusOperatorReported demand
Meta PrometheusMeta471 MW
Google New AlbanyGoogle333 MW
Google ColumbusGoogle303 MW
Google LancasterGoogle137 MW
Meta Bowling GreenMeta0 MW
OpenAI Stargate LordstownSoftbank0 MW

Tagged as a data center by our classification, not by the operator’s own statement. Only campuses with coordinates can be mapped.

Live in Ohio?

Check how far the nearest large data center is from your own address. Free, and your address is not stored.

Check my address Open the map All states