Data centers and new power in Rockingham County, NH

0 MW of new power is waiting to connect to the grid in Rockingham County, NH — 0 active requests. 9 projects are built, 16 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Rockingham County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Rockingham County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Rockingham County right now.

0 MW
of new power is waiting to connect
0 projects asked. Not yet approved.
2.0 GW
has actually been built
9 projects switched on so far.
16
projects gave up
Withdrawn before being built. Normal nationally.

Where every request ever filed here ended up

  • Built 36%
  • Withdrawn 64%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Rockingham County.

What kind of power is asking to connect

    By capacity requested. Data as of 14 October 2026.

    All the numbers

    25 requests ever filed
    Pending applications
    0
    of 25 ever filed
    Capacity queued
    0 MW
    requested, not committed
    Already built
    2.0 GW
    9 projects connected
    Built vs decided
    36.0%
    16 withdrawn

    Source: interconnection queues published by the transmission providers serving this county. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

    Outcome of every request filed here

    OutcomeProjectsCapacityShare
    Built92.0 GW36.0%
    Still waiting00 MW0.0%
    Withdrawn164.5 GW64.0%
    Paused0—0.0%

    Waiting to connect, by type of power

    Key dates for projects here

    no dated windows published
    QueueWhat closesClosesStanding
    FERCFERC large-load show cause — stakeholder comments on RTO responses
    Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
    No date published yetunconfirmed source
    FERCFERC RM26-4 — generic large-load rulemaking
    Still at ANOPR stage.
    No date published yetconfirmed source
    FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
    A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
    No date published yetconfirmed source

    A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

    The biggest projects on file

    top 15 by size
    ProjectTypeCapacityStatusFiledQueue
    Seabrook Power Uprate7Nuclear1.3 GWcompleted2003-01ISONE
    HVDC/AC Tie - Import onlyNuclear1.2 GWwithdrawn2015-02ISONE
    Northern Pass Transmission Project (300 kV HVDC/AC Tie) - Import OnlyNuclear1.1 GWwithdrawn2015-02ISONE
    Combined Cycle Capacity Increase/ Generator ChangeNatural gas904 MWwithdrawn2007-09ISONE
    Essential Power Newington - CNRC IncreaseNatural gas596 MWcompleted2016-04ISONE
    Combined Cycle( See # 226)Natural gas563 MWwithdrawn2006-08ISONE
    Battery StorageBatteries402 MWwithdrawn2023-03ISONE
    Battery StorageBatteries200 MWwithdrawn2023-09ISONE
    SolarSolar100 MWwithdrawn2023-07ISONE
    GRE Capacity UprateNatural gas41 MWcompleted2014-11ISONE
    Combined Cycle IncreaseNatural gas33 MWwithdrawn2014-10ISONE
    Newington Gas Turbine UprateNatural gas28 MWcompleted2014-12ISONE
    EP Newington Energy Capacity IncreaseNatural gas21 MWcompleted2013-03ISONE
    Seabrook LP Turbine Blade replacementNuclear13 MWcompleted2008-10ISONE
    SolarSolar10 MWwithdrawn2015-09ISONE

    How Rockingham County compares

    #1431 in the US · #6 in NH

    Rockingham County ranks #1431 of 1,607 US counties by power waiting to connect, and #6 of 7 in New Hampshire.

    Common questions about power in Rockingham County

    How long does it take to get power for a data center in Rockingham County, NH?

    We do not yet have a median wait for Rockingham County. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 9 projects in Rockingham County have reached energization and 16 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

    How much capacity is available in Rockingham County, NH?

    0 MW is currently requested across 0 active interconnection requests, and 2.0 GW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

    Is Rockingham County, NH a good site for a data center?

    This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our New Hampshire policy page.

    Where does the data on this page come from?

    The interconnection queue published by the transmission providers serving Rockingham County — the utilities in this area — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

    Go deeper on Rockingham County

    The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

    Open Rockingham County on the map County reports All of New Hampshire