Data centers and new power in Meagher County, MT

1.5 GW of new power is waiting to connect to the grid in Meagher County, MT — 4 active requests. Typical wait: 7.5 years. 6 projects are built, 9 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Meagher County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Meagher County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Meagher County right now.

1.5 GW
of new power is waiting to connect
4 projects asked. Not yet approved. Roughly what 1.2 million homes use.
21 MW
has actually been built
6 projects switched on so far.
7.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 27%
  • Still waiting 18%
  • Withdrawn 41%
  • Paused 14%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Meagher County.

What kind of power is asking to connect

  • Wind 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

22 requests ever filed
Pending applications
4
of 22 ever filed
Capacity queued
1.5 GW
requested, not committed
Already built
21 MW
6 projects connected
Built vs decided
40.0%
9 withdrawn
Median wait
7.5 yr
for applications still pending
Connected capacity
18 MW
indicator, see note

Source: interconnection queues published by Avista, PacifiCorp. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built621 MW27.3%
Still waiting41.5 GW18.2%
Withdrawn91.6 GW40.9%
Paused3—13.6%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Wind41.5 GW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
101Wind800 MWwithdrawn2008-10NWMT
82Wind600 MWactive2019-02Avista
176Solar600 MWwithdrawn2014-12NWMT
310Solar450 MWsuspended2016-12NWMT
C002Solar450 MWsuspended2016-12PacifiCorp
C013Wind326 MWactive2021-01PacifiCorp
83Wind300 MWactive2019-03Avista
C007Wind300 MWactive2019-03PacifiCorp
71Wind300 MWsuspended2019-03PSE
99Wind200 MWwithdrawn2008-09NWMT
89Wind20 MWwithdrawn2008-04NWMT
46Wind10 MWcompleted2006-06NWMT
323Wind9 MWwithdrawn2018-12NWMT
42Wind8 MWwithdrawn2006-02NWMT
318Wind3 MWwithdrawn2017-06NWMT

How Meagher County compares

#250 in the US · #3 in MT

Meagher County ranks #250 of 1,607 US counties by power waiting to connect, and #3 of 29 in Montana.

Common questions about power in Meagher County

How long does it take to get power for a data center in Meagher County, MT?

The median wait for a project still in the interconnection queue in Meagher County is 7.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 6 projects in Meagher County have reached energization and 9 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Meagher County, MT?

1.5 GW is currently requested across 4 active interconnection requests, and 21 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Meagher County, MT a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Montana policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Meagher County — Avista, PacifiCorp — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Meagher County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Meagher County on the map County reports All of Montana