Sunflower County, MS interconnection queue
5 interconnection applications are pending in Sunflower County, MS, requesting 807 MW of new generating capacity, as of 15 August 2026. 1 projects have been built here and 17 have been withdrawn since 2018.
Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 15 August 2026. A queued project is a request, not a commitment.
What is waiting in Sunflower County, by fuel
| Fuel | Projects | Capacity requested |
|---|---|---|
| Wind | 2 | 407 MW |
| Hybrid | 2 | 250 MW |
| Solar | 1 | 150 MW |
Outcomes of every application filed here
| Outcome | Projects | Capacity | Share |
|---|---|---|---|
| Built | 1 | 99 MW | 4.3% |
| Still pending | 5 | 807 MW | 21.7% |
| Withdrawn | 17 | 2.3 GW | 73.9% |
| Suspended | 0 | — | 0.0% |
Withdrawal is the ordinary outcome of an interconnection application nationally, not a sign of a problem in this county. Most withdrawals are a developer testing a site and moving on.
The largest projects on file
| Project | Fuel | Capacity | Status | Filed | Queue |
|---|---|---|---|---|---|
| INDIANOLA 230/115 SUB - TILLATOBA 230.0kV | Wind | 350 MW | active | 2024-04 | MISO |
| INDIANOLA 230/115 SUB - TILLATOBA 230.0kV | Solar | 303 MW | withdrawn | 2024-04 | MISO |
| INDIANOLA 230/115 SUB - TILLATOBA 230.0kV | Solar | 230 MW | withdrawn | 2024-04 | MISO |
| Indianola 230/130 Sub | Solar | 200 MW | withdrawn | 2021-09 | MISO |
| ROUNDAWAY SS (CE) - CLARKSDALE 115.0kV | Solar | 200 MW | withdrawn | 2025-10 | MISO |
| Drew 115kV Substation | Wind | 167 MW | withdrawn | 2019-04 | MISO |
| INDIANOLA 230/115 SUB - TILLATOBA 230.0kV | Wind | 163 MW | withdrawn | 2024-12 | MISO |
| Delta Ms - Ruleville 115kV Line | Solar | 150 MW | withdrawn | 2022-09 | MISO |
| DELTA SWYD - SHELBY SS 115.0kV | Solar | 150 MW | active | 2022-09 | MISO |
| GERALDANDRUS SES SWITCHYARD-INDIANOLA 230 KV | Hybrid | 150 MW | active | 2022-09 | MISO |
| INDIANOLA 230/115 SUB - TILLATOBA 230.0kV | Wind | 150 MW | withdrawn | 2024-04 | MISO |
| CLEVELAND/SOUTH - STEINER (CE) 115.0kV | Solar | 130 MW | withdrawn | 2022-09 | MISO |
| Indianola 230kV Substation | Solar | 100 MW | withdrawn | 2021-09 | MISO |
| CLEVELAND/SOUTH - STEINER (CE) 115.0kV | Hybrid | 100 MW | active | 2022-09 | MISO |
| DELTA SWYD - DREW [MS] 115.0kV | Solar | 100 MW | withdrawn | 2022-09 | MISO |
How this county ranks
Sunflower County ranks #467 of 1,607 US counties by capacity currently queued, and #4 of 31 in Mississippi.
Other Mississippi counties in the queue
| County | Pending | Capacity queued |
|---|---|---|
| Clay County | 5 | 850 MW |
| Madison County | 5 | 827 MW |
| Lowndes County | 2 | 820 MW |
| Perry County | 3 | 500 MW |
| Holmes County | 2 | 425 MW |
| Jasper County | 3 | 365 MW |
| DeSoto County | 2 | 350 MW |
| Tunica County | 2 | 337 MW |
Go deeper on Sunflower County
The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.
Open Sunflower County on the map County reports All of Mississippi