Data centers and new power in Harrison County, KY

70 MW of new power is waiting to connect to the grid in Harrison County, KY — 1 active requests. Typical wait: 8.7 years. 2 projects are built, 8 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Harrison County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Harrison County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Harrison County right now.

70 MW
of new power is waiting to connect
1 projects asked. Not yet approved. Roughly what 56,000 homes use.
180 MW
has actually been built
2 projects switched on so far.
8.7 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Built 18%
  • Still waiting 9%
  • Withdrawn 73%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Harrison County.

What kind of power is asking to connect

  • Solar 100%

By capacity requested. Data as of 14 October 2026.

All the numbers

11 requests ever filed
Pending applications
1
of 11 ever filed
Capacity queued
70 MW
requested, not committed
Already built
180 MW
2 projects connected
Built vs decided
20.0%
8 withdrawn
Median wait
8.7 yr
for applications still pending
Connected capacity
100 MW
indicator, see note

Source: interconnection queues published by PJM. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built2180 MW18.2%
Still waiting170 MW9.1%
Withdrawn8440 MW72.7%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar170 MW

Key dates for projects here

no dated windows published
QueueWhat closesClosesStanding
PJMDominion GS-5 (Virginia SCC PUR-2025-00058) - ESAs signed on or after this date carry the 14-year term
From this date the GS-5 large-load tariff carries a 14-year minimum term, alongside the reported 85% of contracted transmission demand minimum and $1…
No date published yetdisputed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 11 by size
ProjectTypeCapacityStatusFiledQueue
Jacksonville-Renaker 138 kVSolar100 MWcompleted2017-02PJM
Jacksonville Tap - Renaker 138 kVSolar100 MWwithdrawn2023-03PJM
Jacksonville-Renaker 138kV ISolar80 MWcompleted2016-09PJM
Broadwell SolarSolar80 MWwithdrawn2016-09PJM
Cynthia-Headquarters 69 kVSolar70 MWactive2018-02PJM
Cynthiana Tie - Headquarters 69 kVSolar70 MWwithdrawn2023-02PJM
Jacsonville-Renaker 138kV IIISolar60 MWwithdrawn2017-02PJM
Jacksonville-Renaker 138kV IVSolar60 MWwithdrawn2018-01PJM
LGE-GIS-2017-003Solar35 MWwithdrawn2017-04LGE-KU
LGE-GIS-2017-004Solar25 MWwithdrawn2017-06LGE-KU
LGE-GIS-2017-005Solar10 MWwithdrawn2017-08LGE-KU

How Harrison County compares

#1158 in the US · #26 in KY

Harrison County ranks #1158 of 1,607 US counties by power waiting to connect, and #26 of 37 in Kentucky.

CountyWaitingCapacity queued
Jefferson County73.2 GW
Muhlenberg County61.4 GW
Trimble County9925 MW
Mercer County6922 MW
Henderson County3800 MW
Fleming County4548 MW
Mccraken3466 MW
Martin County2300 MW

Common questions about power in Harrison County

How long does it take to get power for a data center in Harrison County, KY?

The median wait for a project still in the interconnection queue in Harrison County is 8.7 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 2 projects in Harrison County have reached energization and 8 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Harrison County, KY?

70 MW is currently requested across 1 active interconnection requests, and 180 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Harrison County, KY a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Kentucky policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Harrison County — PJM — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Harrison County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Harrison County on the map County reports All of Kentucky