Data centers and new power in Vermilion County, IL

743 MW of new power is waiting to connect to the grid in Vermilion County, IL — 5 active requests. Typical wait: 2.5 years. 0 projects are built, 11 withdrawn. Data as of 14 October 2026.

Live here?

Is one near your house?

We have not mapped a large AI data center inside Vermilion County itself — but we track the biggest ones nationally, and requests to connect new power here are on the public record.

Free. Your address is used for one distance and is not stored.

The power picture

What is happening with electricity in Vermilion County

Every new power plant, battery or big customer has to join a waiting list before it can plug into the grid. This is what that list looks like in Vermilion County right now.

743 MW
of new power is waiting to connect
5 projects asked. Not yet approved. Roughly what 594,000 homes use.
0 MW
has actually been built
0 projects switched on so far.
2.5 yrs
typical wait to plug in

Where every request ever filed here ended up

  • Still waiting 31%
  • Withdrawn 69%

Most requests in the US are withdrawn — a developer tests a site and moves on. That is normal, not a warning sign for Vermilion County.

What kind of power is asking to connect

  • Solar 87%
  • Wind 13%

By capacity requested. Data as of 14 October 2026.

All the numbers

16 requests ever filed
Pending applications
5
of 16 ever filed
Capacity queued
743 MW
requested, not committed
Already built
0 MW
0 projects connected
Built vs decided
0.0%
11 withdrawn
Median wait
2.5 yr
for applications still pending
Connected capacity
521 MW
indicator, see note

Source: interconnection queues published by MISO. Parsed and normalised by Watt Street. Data as of 14 October 2026. A queued project is a request, not a commitment.

Outcome of every request filed here

OutcomeProjectsCapacityShare
Built00 MW0.0%
Still waiting5743 MW31.2%
Withdrawn112.2 GW68.8%
Paused0—0.0%

Waiting to connect, by type of power

TypeProjectsCapacity requested
Solar4643 MW
Wind1100 MW

Key dates for projects here

1 dated · next closes 2027-09-10 (MISO)
QueueWhat closesClosesStanding
MISOMISO DPP-2026 Definitive Planning Phase application deadline
Attachment X of the tariff and BPM-015.
2027-09-10confirmed source
FERCFERC large-load show cause — stakeholder comments on RTO responses
Comments on the six RTO/ISO responses to the FPA section 206 show-cause orders of 18 June 2026 (PJM EL26-67, SPP EL26-68, NYISO EL26-69, MISO EL26-70…
No date published yetunconfirmed source
FERCFERC RM26-4 — generic large-load rulemaking
Still at ANOPR stage.
No date published yetconfirmed source
FERCGeorgia PSC - Georgia Power must file large-load contracts 30 days before execution
A standing obligation rather than a dated one: large-load contracts must be filed with the commission at least 30 days before they are executed.
No date published yetconfirmed source

A date marked confirmed was checked by a person against the authority's own tariff, order or form page. Anything else is listed so you know it exists, with a link so you can check it yourself. Full calendar.

The biggest projects on file

top 15 by size
ProjectTypeCapacityStatusFiledQueue
Sydney to Bunsonville 345kV LineSolar + battery412 MWwithdrawn2020-06MISO
4VERMILION - 4NCHAMPGN W 138.0kVSolar300 MWwithdrawn2024-04MISO
Bunsonville 345kVWind200 MWwithdrawn2020-06MISO
Bunsonville 138kVSolar200 MWwithdrawn2020-06MISO
Other_Solar200 MWwithdrawn2024-04MISO
Darwin-Eugene 345kVWind200 MWwithdrawn2009-09PJM
Tilton SwitchyardSolar188 MWactive2025-05MISO
J2192 POISolar180 MWactive2024-04MISO
Rossville 138kV on the Hoopeston to Vermilion 138kV LineSolar175 MWactive2024-03MISO
Hoopeston 138kVSolar150 MWwithdrawn2022-09MISO
Hoopeston West 138kVWind150 MWwithdrawn2022-09MISO
Hoopston 138kVWind150 MWwithdrawn2020-06MISO
Hoopeston WestWind150 MWwithdrawn2024-04MISO
7BUNSONVILLE - 7SIDNEY 345.0kVSolar100 MWactive2022-06MISO
J2192 POIWind100 MWactive2024-04MISO

How Vermilion County compares

#496 in the US · #33 in IL

Vermilion County ranks #496 of 1,607 US counties by power waiting to connect, and #33 of 64 in Illinois.

CountyWaitingCapacity queued
Lee County126.4 GW
Will County54.3 GW
McLean County112.9 GW
Ogle County52.9 GW
LaSalle County72.8 GW
Christian County82.3 GW
Peoria County72.1 GW
Tazewell County101.9 GW

Common questions about power in Vermilion County

How long does it take to get power for a data center in Vermilion County, IL?

The median wait for a project still in the interconnection queue in Vermilion County is 2.5 years. Across the US, most large loads are quoted three to seven years depending on the market and whether network upgrades are needed. 0 projects in Vermilion County have reached energization and 11 were withdrawn, so the withdrawal rate here is a better guide to risk than any single quoted timeline.

How much capacity is available in Vermilion County, IL?

743 MW is currently requested across 5 active interconnection requests, and 0 MW has actually been built. A queued megawatt is a request, not deliverable capacity — most queued projects are never built. For deliverable offtake capacity at a specific substation you need a utility study, not a queue.

Is Vermilion County, IL a good site for a data center?

This page gives you the power half of that answer: what is queued, what has been energized, how long the wait runs, and which large load interconnection requests are already recorded nearby. The other half — the state policy position, moratoriums and large load tariffs — is on our Illinois policy page.

Where does the data on this page come from?

The interconnection queue published by the transmission providers serving Vermilion County — MISO — parsed and normalised by Watt Street. Every figure carries the date it was true. Data as of 14 October 2026.

Go deeper on Vermilion County

The interactive map plots every one of these applications, and a generated county report puts them in a sourced PDF with the date each figure was true on every page.

Open Vermilion County on the map County reports All of Illinois